My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
715 Leland Avenue_AA 2023-0724
sbend
>
Public
>
Historic Preservation
>
2023
>
August
>
Administrative Approvals
>
715 Leland Avenue_AA 2023-0724
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2023 2:14:41 PM
Creation date
7/28/2023 2:15:03 PM
Metadata
Fields
Template:
South Bend HPC
HPC Street Address
715 Leland Avenue
HPC Document Type
Certification
HPC Local Historic District
ix. Chapin Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
**Description of Proposed Work <br />The proposed work for this site includes the removal of some trees and concrete <br />elements on the property,the construction of a retaining wall,and installation of a perimeter <br />fence and benches.Dead trees require removal and trees with dead or decaying limbs require <br />pruning to improve the health of the trees and reduce risk of any injuries due to falling trees or <br />limbs.Concrete elements around the property include a concrete ring,pad,and set of broken <br />stairs that will be excavated and removed to reduce any safety hazards they present as a <br />playground site for children.To remediate slope creep into the sidewalk,the area will be <br />excavated and a stone block retaining wall will be built to prevent further creep. <br /> <br /> Stone benches will be installed around the property to provide seating for parents to <br />supervise their children. <br />A more detailed description of all proposed work can be found in the project overview. <br />A Note about Communication <br />Please include the contractor,Kathy Schuth,in all communications regarding the COA. <br />While the St.Paul Bethel Missionary Baptist Church is the owner of the physical property,they <br />are not in on the day-to-day activities.The church has outsourced all work on the property to the <br />Near Northwest Neighborhood Association.
The URL can be used to link to this page
Your browser does not support the video tag.