My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WWTP DAF Building Improvements - Design Services Proj No. 123-031 – Black & Veatch Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
WWTP DAF Building Improvements - Design Services Proj No. 123-031 – Black & Veatch Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2023 2:23:08 PM
Creation date
7/25/2023 2:22:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/25/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 16 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />Engineer’s knowledge, information and belief, Contractor’s Work has progressed to the <br />point indicated, the Work is generally in accordance with the Contract Documents <br />(subject to an evaluation of the Work as a functioning whole prior to or upon <br />Substantial Completion, to the results of any subsequent tests called for in the Contract <br />Documents, and to any other qualifications stated in the recommendation), and the <br />conditions precedent to Contractor’s being entitled to such payment appear to have <br />been fulfilled in so far as it is Engineer’s responsibility to observe Contractor’s Work. <br />In the case of unit price work, Engineer’s recommendations of payment will include <br />final determinations of quantities and classifications of Contractor’s Work (subject to <br />any subsequent adjustments allowed by the Contract Documents). <br />b. By recommending any payment, Engineer shall not thereby be deemed to have <br />represented that observations made by Engineer to check the quality or quantity of <br />Contractor’s Work as it is performed and furnished have been exhaustive, extended to <br />every aspect of Contractor’s Work in progress, or involved detailed inspections of the <br />Work beyond the responsibilities specifically assigned to Engineer in this Agreement <br />and the Contract Documents. Neither Engineer’s review of Contractor’s Work for the <br />purposes of recommending payments nor Engineer’s recommendation of any payment <br />including final payment will impose on Engineer responsibility to supervise, direct, or <br />control Contractor’s Work in progress or for the means, methods, techniques, <br />sequences, or procedures of construction or safety precautions or programs incident <br />thereto, or Contractor’s compliance with Laws and Regulations applicable to <br />Contractor’s furnishing and performing the Work. It will also not impose responsibility <br />on Engineer to make any examination to ascertain how or for what purposes Contractor <br />has used the moneys paid on account of the Contract Price, or to determine that title to <br />any portion of the Work in progress, materials, or equipment has passed to Owner free <br />and clear of any liens, claims, security interests, or encumbrances, or that there may not <br />be other matters at issue between Owner and Contractor that might affect the amount <br />that should be paid. <br />16. Contractor’s Completion Documents: Receive, review, and transmit to Owner <br />maintenance and operating instructions, schedules, guarantees, bonds, certificates or other <br />evidence of insurance required by the Contract Documents, certificates of inspection, tests <br />and approvals, Shop Drawings, Samples and other data approved as provided under <br />Paragraph A1.05.A.11, and transmit the annotated record documents which are to be <br />assembled by Contractor in accordance with the Contract Documents to obtain final <br />payment. The extent of such review by Engineer will be limited as provided in Paragraph <br />A1.05.A.11. <br />17. Substantial Completion: Promptly after notice from Contractor that Contractor considers <br />the entire Work ready for its intended use, in company with Owner and Contractor, visit the <br />Project to determine if the Work is substantially complete. If after considering any <br />objections of Owner, Engineer considers the Work substantially complete, Engineer shall <br />deliver a certificate of Substantial Completion to Owner and Contractor. <br />18. Additional Tasks: Perform or provide the following additional Construction Phase tasks or <br />deliverables: [here list any such tasks or deliverables].
The URL can be used to link to this page
Your browser does not support the video tag.