My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WWTP DAF Building Improvements - Design Services Proj No. 123-031 – Black & Veatch Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
WWTP DAF Building Improvements - Design Services Proj No. 123-031 – Black & Veatch Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2023 2:23:08 PM
Creation date
7/25/2023 2:22:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/25/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 9 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />Engineer will review shop drawings and other data submitted by the Contractor as required by the <br />Construction Contract Documents. The Engineer's review shall be for general conformity to the <br />Construction Contract Documents for the project and shall not relieve the Contractor of any of his <br />contractual responsibilities. Such reviews shall not extend to means, methods, techniques, <br />sequences, or procedures of construction or to safety precautions and programs incident thereto. <br />The Scope of Services is based on review of up to 40 submittals or re-submittals inclusive of both <br />Bid Packages. Additional submittal reviews can be provided as a supplemental service. Engineer <br />will also receive and review guarantees, bonds, and certificates of inspection, tests, and approvals <br />which are to be assembled by the Contractor in accordance with the construction Contract <br />Documents and transmit them to the Owner. <br />Review of “Substitutes” requests by the Contractor shall follow the requirements of the General <br />Conditions in the Contract Documents. The Engineer will perform such reviews as a supplemental <br />service and will track the time and expenses separately for payment. Review of “Substitutes” will <br />be directed by the Owner prior to Engineer performing the review. <br />Task 205 – Site Visits <br />Engineer will make periodic visits to the construction site when requested by the Owner to observe <br />construction and confer with the Owner or Contractor concerning problems and/or progress of the <br />Work. The Scope is based on four trips and includes half-day site visits for the engineering <br />manager to review design-related questions and construction conflict or issue resolution inclusive <br />of both Bid Packages. Additional trips may be provided as a supplemental service. <br />The Engineer shall not have responsibility for the superintendence of construction site conditions, <br />safety, safe practices or unsafe practices or conditions, operation, equipment, or personnel other <br />than employees of the Engineer. This service will in no way relieve the Contractor of complete <br />supervision of the Work or the Contractor’s obligation for complete compliance to the Contract <br />Documents. The Contractor shall have sole responsibility for safety and for maintaining safe <br />practices and avoiding unsafe practices or conditions. <br />Task 206 – Final Inspection <br />Upon substantial completion of each Bid Package, Engineer will conduct an inspection of the <br />project site and prepare a punchlist of items to be completed or corrected by the Contractor before <br />final completion of the project. Engineer will submit results of the inspection to the Owner and <br />Contractor. Upon completion or correction of the items of work on the punch list, Engineer will <br />conduct one final inspection for each Bid Package to determine if the work is completed and <br />provide written recommendations to the Owner concerning final payment including a list of items, <br />if any, to be completed prior to the making of such payment. Inspections will be conducted by the <br />engineering manager. <br />Task 207 – Revise Construction Contract Drawings <br />Upon completion of the project, Engineer will revise the construction contract drawings for each <br />Bid Package to conform to the construction records. Revisions to the construction contract <br />drawings will be provided by the Contractor for editing by the Engineer. An electronic copy in
The URL can be used to link to this page
Your browser does not support the video tag.