Laserfiche WebLink
BID TABULATION <br />2023 Contractor Paving Round 2 <br />Project No: 123-024 <br />Base Bid <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />2 <br />Mobilization and Demobilization <br />1 <br />LS <br />3 <br />Milling Asphalt, 3" <br />79,458 <br />SY <br />4 <br />HMA Surface, 9.5 mm - Type B, PG 64-28P <br />4,008 <br />TONS <br />5 <br />HMA Surface, 9.5 mm - Type B, PG 70-22P <br />2,442 <br />TONS <br />6 <br />HMA Intermediate, 12.5mm - Type B <br />6,450 <br />TONS <br />7 <br />Tack Coat <br />26 <br />TONS <br />8 <br />Joint Adhesive, Surface <br />22,683 <br />LF <br />9 <br />Adjust Manhole to Grade <br />26 <br />EA <br />10 <br />Adjust Inlet to Grade <br />10 <br />EA <br />11 <br />Adjust Water Valve Structure to Grade <br />18 <br />EA <br />12 <br />Traffic Loop Lane Replacement <br />2 <br />EA <br />13 <br />Pedestrian Push Button <br />2 <br />EA <br />14 <br />Line, Thermoplastic, Solid, White, 4" <br />2000 <br />LF <br />15 <br />Line, Thermoplastic, Solid, White, 6" <br />804 <br />LF <br />16 <br />Line, Thermoplastic, Solid, Yellow, 4" <br />11111 <br />LF <br />17 <br />Grooving for Pavement Markings, 4" <br />13111 <br />LF <br />18 <br />Pavement Message Markings, Thermoplastic, White, Lane Indication Arrow <br />4 <br />EA <br />19 <br />Transverse Marking, Thermoplastic, Solid, White, 24" <br />173 <br />LF <br />20 <br />Concrete Curb Ramp, Removal <br />630 <br />SY <br />21 <br />Concrete Curb Ramp, Installation <br />620 <br />SY <br />22 <br />Center Island Conversion to Asphalt <br />30 <br />SY <br />BASE BID TOTAL <br />Alternate No. 1 <br />1 <br />Maintenance of Traffic <br />2 <br />Mobilization and Demobilization <br />3 <br />Milling, 4" <br />4 <br />HMA Surface, 9.5 mm - Type B <br />5 <br />HMA Intermediate, 12.5 mm - Type B <br />6 <br />Tack Coat <br />7 <br />1 Joint Adhesive, Surface <br />1 <br />LS <br />1 <br />LS <br />2747 <br />SY <br />227 <br />TONS <br />378 <br />TONS <br />2 <br />TONS <br />200 <br />LF <br />ALTERNATE NO. 1 TOTAI <br />BASE TOTAI <br />ALTERNATE NO. 1 TOTAI <br />BASE + ALT. NO. 1 TOTAI <br />For Bids Due: July 11, 2023 <br />Engineer's Estimate <br />Unit Price Item Total <br />Rieth Riley Construction Co., Inc <br />Unit Price Item Total <br />Milestone Contractors North, Inc. <br />Unit Price Item Total <br />$ 191,163.02 <br />$ 191,163.02 <br />$ 79,230.51 <br />$ 79,230.51 <br />$ 105,000.00 <br />$ 105,000.00 <br />$ 191,163.02 <br />$ 191,163.02 <br />$ 48,314.37 <br />$ 48,314.37 <br />$ 75,361.40 <br />$ 75,361.40 <br />$ <br />4.20 <br />$ 333,723.60 <br />$ 3.69 <br />$ 293,200.02 <br />$ 3.75 <br />$ 297,967.50 <br />$ <br />105.00 <br />$ 420,840.00 <br />$ 98.55 <br />$ 394,988.40 <br />$ 100.00 <br />$ 400,800.00 <br />$ <br />110.00 <br />$ 268,620.00 <br />$ 92.64 <br />$ 226,226.88 <br />$ 98.00 <br />$ 239,316.00 <br />$ <br />100.00 <br />$ 645,000.00 <br />$ 78.07 <br />$ 503,551.50 <br />$ 87.00 <br />$ 561,150.00 <br />$ <br />1.05 <br />$ 27.30 <br />$ 579.77 <br />$ 15,074.02 <br />$ 2,500.00 <br />$ 65,000.00 <br />$ <br />0.80 <br />$ 18,146.40 <br />$ 1.00 <br />$ 22,683.00 <br />$ 0.50 <br />$ 11,341.50 <br />$ <br />250.00 <br />$ 6,500.00 <br />$ 300.00 <br />$ 7,800.00 <br />$ 250.00 <br />$ 6,500.00 <br />$ <br />250.00 <br />$ 2,500.00 <br />$ 250.00 <br />$ 2,500.00 <br />$ 50.00 <br />$ 500.00 <br />$ <br />100.00 <br />$ 1,800.00 <br />$ 300.00 <br />$ 5,400.00 <br />$ 250.00 <br />$ 4,500.00 <br />$ <br />3,300.00 <br />$ 6,600.00 <br />$ 3,200.00 <br />$ 6,400.00 <br />$ 3,200.00 <br />$ 6,400.00 <br />$ <br />500.00 <br />$ 1,000.00 <br />$ 3,450.00 <br />$ 6,900.00 <br />$ 3,450.00 <br />$ 6,900.00 <br />$ <br />0.90 <br />$ 1,800.00 <br />$ 0.61 <br />$ 1,220.00 <br />$ 0.61 <br />$ 1,220.00 <br />$ <br />0.71 <br />$ 570.84 <br />$ 1.14 <br />$ 916.56 <br />$ 1.14 <br />$ 916.56 <br />$ <br />0.74 <br />$ 8,222.14 <br />$ 0.61 <br />$ 6,777.71 <br />$ 0.61 <br />$ 6,777.71 <br />$ <br />0.71 <br />$ 9,308.81 <br />$ 0.58 <br />$ 7,604.38 <br />$ 0.58 <br />$ 7,604.38 <br />$ <br />300.00 <br />$ 1,200.00 <br />$ 205.00 <br />$ 820.00 <br />$ 205.00 <br />$ 820.00 <br />$ <br />15.00 <br />$ 2,595.00 <br />$ 13.15 <br />$ 2,274.95 <br />$ 13.15 <br />$ 2,274.95 <br />$ <br />60.00 <br />$ 37,800.00 <br />$ 55.63 <br />$ 35,046.90 <br />$ 50.00 <br />$ 31,500.00 <br />$ <br />210.00 <br />$ 130,200.00 <br />$ 168.84 <br />$ 104,680.80 <br />$ 165.00 <br />$ 102,300.00 <br />$ <br />250.00 <br />$ 7,500.00 <br />$ 323.00 <br />$ 9,690.00 <br />$ 125.00 <br />$ 3,750.00 <br />$ 2,286,280.13 <br />1 <br />$ 1,781,300.00 <br />$ 1,937,900.00 <br />Engineer's Estimate <br />Unit Price Item Total <br />Rieth Riley Construction Co., Inc <br />Unit Price Item Total <br />Milestone Contractors North, Inc. <br />Unit Price Item Total <br />$ <br />7,828.00 <br />$ 7,828.00 <br />$ 20,393.68 <br />$ 20,393.68 <br />$ 5,600.00 <br />$ 5,600.00 <br />$ <br />5,479.60 <br />$ 5,479.60 <br />$ 6,620.02 <br />$ 6,620.02 <br />$ 5,000.00 <br />$ 5,000.00 <br />$ <br />6.00 <br />$ 16,482.00 <br />$ 15.89 <br />$ 43,649.83 <br />$ 5.00 <br />$ 13,735.00 <br />$ <br />105.00 <br />$ 23,835.00 <br />$ 176.37 <br />$ 40,035.99 <br />$ 115.00 <br />$ 26,105.00 <br />$ <br />100.00 <br />$ 37,800.00 <br />$ 122.23 <br />$ 46,202.94 <br />$ 95.00 <br />$ 35,910.00 <br />$ <br />1.50 <br />$ 3.00 <br />$ 579.77 <br />$ 1,159.54 <br />$ 250.00 <br />$ 500.00 <br />$ <br />0.80 <br />$ 160.00 <br />$ 6.19 <br />$ 1,238.00 <br />$ 1.00 <br />$ 200.00 <br />$ 91,587.60 <br />$ 159,300.00 <br />$ 87,050.00 <br />$ 2,286,280.13 <br />$ 1,781,300.00 <br />$ 1,937,900.00 <br />$ 91,587.60 <br />$ 159,300.00 <br />$ 87,050.00 <br />$ 2,377,867.73 <br />$ 1,940,600.00 <br />$ 2,024,950.00 <br />Non -Collusion Affadavit <br />Y <br />Y <br />Bid Bond <br />Y <br />Y <br />M/WBE Inclusion <br />Y <br />Y <br />Addendum #1 <br />Y <br />Y <br />I hereby certify that the above truly and accurately represents bids received for this project on July 11, 2023 <br />Scott Kreeger, Project Engineer <br />Page 1 of 1 <br />