BID TABULATION2023 Contractor Paving Round 2Project No: 123-024For Bids Due: July 11, 2023Base BidItem No. DescriptionQuantity Unit Unit Price Item Total Unit Price Item Total Unit Price Item Total1 Maintenance of Traffic1 LS 191,163.02$ 191,163.02$ 79,230.51$ 79,230.51$ 105,000.00$ 105,000.00$ 2 Mobilization and Demobilization1 LS 191,163.02$ 191,163.02$ 48,314.37$ 48,314.37$ 75,361.40$ 75,361.40$ 3 Milling Asphalt, 3"79,458 SY4.20$ 333,723.60$ 3.69$ 293,200.02$ 3.75$ 297,967.50$ 4 HMA Surface, 9.5 mm – Type B, PG 64-28P4,008 TONS 105.00$ 420,840.00$ 98.55$ 394,988.40$ 100.00$ 400,800.00$ 5 HMA Surface, 9.5 mm – Type B, PG 70-22P2,442 TONS 110.00$ 268,620.00$ 92.64$ 226,226.88$ 98.00$ 239,316.00$ 6 HMA Intermediate, 12.5mm - Type B6,450 TONS 100.00$ 645,000.00$ 78.07$ 503,551.50$ 87.00$ 561,150.00$ 7 Tack Coat26 TONS1.05$ 27.30$ 579.77$ 15,074.02$ 2,500.00$ 65,000.00$ 8 Joint Adhesive, Surface22,683 LF0.80$ 18,146.40$ 1.00$ 22,683.00$ 0.50$ 11,341.50$ 9 Adjust Manhole to Grade26 EA250.00$ 6,500.00$ 300.00$ 7,800.00$ 250.00$ 6,500.00$ 10 Adjust Inlet to Grade10 EA250.00$ 2,500.00$ 250.00$ 2,500.00$ 50.00$ 500.00$ 11 Adjust Water Valve Structure to Grade18 EA100.00$ 1,800.00$ 300.00$ 5,400.00$ 250.00$ 4,500.00$ 12 Traffic Loop Lane Replacement2 EA 3,300.00$ 6,600.00$ 3,200.00$ 6,400.00$ 3,200.00$ 6,400.00$ 13 Pedestrian Push Button2 EA500.00$ 1,000.00$ 3,450.00$ 6,900.00$ 3,450.00$ 6,900.00$ 14 Line, Thermoplastic, Solid, White, 4"2000 LF0.90$ 1,800.00$ 0.61$ 1,220.00$ 0.61$ 1,220.00$ 15 Line, Thermoplastic, Solid, White, 6"804 LF0.71$ 570.84$ 1.14$ 916.56$ 1.14$ 916.56$ 16 Line, Thermoplastic, Solid, Yellow, 4"11111 LF0.74$ 8,222.14$ 0.61$ 6,777.71$ 0.61$ 6,777.71$ 17 Grooving for Pavement Markings, 4"13111 LF0.71$ 9,308.81$ 0.58$ 7,604.38$ 0.58$ 7,604.38$ 18 Pavement Message Markings, Thermoplastic, White, Lane Indication Arrow4 EA300.00$ 1,200.00$ 205.00$ 820.00$ 205.00$ 820.00$ 19 Transverse Marking, Thermoplastic, Solid, White, 24"173 LF15.00$ 2,595.00$ 13.15$ 2,274.95$ 13.15$ 2,274.95$ 20 Concrete Curb Ramp, Removal630 SY60.00$ 37,800.00$ 55.63$ 35,046.90$ 50.00$ 31,500.00$ 21 Concrete Curb Ramp, Installation620 SY210.00$ 130,200.00$ 168.84$ 104,680.80$ 165.00$ 102,300.00$ 22 Center Island Conversion to Asphalt30 SY250.00$ 7,500.00$ 323.00$ 9,690.00$ 125.00$ 3,750.00$ 2,286,280.13$ 1,781,300.00$ 1,937,900.00$ Alternate No. 1Item No. DescriptionQuantity Unit Unit Price Item Total Unit Price Item Total Unit Price Item Total1 Maintenance of Traffic1 LS 7,828.00$ 7,828.00$ 20,393.68$ 20,393.68$ 5,600.00$ 5,600.00$ 2 Mobilization and Demobilization1 LS 5,479.60$ 5,479.60$ 6,620.02$ 6,620.02$ 5,000.00$ 5,000.00$ 3 Milling, 4"2747 SY6.00$ 16,482.00$ 15.89$ 43,649.83$ 5.00$ 13,735.00$ 4 HMA Surface, 9.5 mm - Type B227 TONS 105.00$ 23,835.00$ 176.37$ 40,035.99$ 115.00$ 26,105.00$ 5 HMA Intermediate, 12.5 mm - Type B378 TONS 100.00$ 37,800.00$ 122.23$ 46,202.94$ 95.00$ 35,910.00$ 6 Tack Coat2 TONS1.50$ 3.00$ 579.77$ 1,159.54$ 250.00$ 500.00$ 7 Joint Adhesive, Surface200 LF0.80$ 160.00$ 6.19$ 1,238.00$ 1.00$ 200.00$ 91,587.60$ 159,300.00$ 87,050.00$ I hereby certify that the above truly and accurately represents bids received for this project on July 11, 2023Scott Kreeger, Project EngineerYRieth Riley Construction Co., Inc Milestone Contractors North, Inc.YYYYRieth Riley Construction Co., Inc Milestone Contractors North, Inc.1,781,300.00$ 159,300.00$ 1,940,600.00$ 1,937,900.00$ 87,050.00$ 2,024,950.00$ YYBid BondYBASE BID TOTALEngineer's EstimateNon-Collusion AffadavitEngineer's EstimateALTERNATE NO. 1 TOTALBASE TOTALALTERNATE NO. 1 TOTALBASE + ALT. NO. 1 TOTAL2,286,280.13$ 91,587.60$ 2,377,867.73$ M/WBE InclusionAddendum #1Page 1 of 1