Laserfiche WebLink
2x2 LIGHT FIXTURE, REFER TO ELECTRICAL <br />2x4 LIGHT FIXTURE, REFER TO ELECTRICAL <br />LIGHT FIXTURE, REFER TO ELECTRICAL <br />RECESSED CAN LIGHT FIXTURE, <br />REFER TO ELECTRICAL <br />SURFACE MOUNTED LIGHT FIXTURE, REFER <br />TO ELECTRICAL <br />SUPPLY DIFFUSER, REFER TO MECHANICAL <br />RETURN DIFFUSER, REFER TO MECHANICAL <br />SUSPENDED ACOUSTICAL CEILING SYSTEM <br />GYPSUM BOARD CEILING OR BULKHEAD <br />LEGEND <br />8'-0"CEILING HEIGHT8'-6" <br />1 1 <br />1 <br />1 <br />1 1 <br />1 1 <br />1 1 <br />1 1 <br />5 <br />2 <br />2 <br />6 <br />1 1 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />1 <br />3 <br />1 <br />1 <br />1 <br />1 <br />1 1 1 <br />3 <br />3 3 <br />4 <br />10 <br />9 <br />7 8 <br />TENANT SPACE <br />NO WORK IN THIS AREA <br />224 WEST JEFFERSON BLVD <br />SUITE 100 <br />SOUTH BEND INDIANA 46601 <br />574-643-7567 <br />www.CreativeDesignInc.com <br />DRAWN BY: <br />CHECKED BY: <br />DATE:SCALE: <br />JOB NO. <br />ARCHITECT: <br />SHEET NAME <br />NO.DATE <br />PROFESSIONAL'S SEAL <br />SUBMISSION <br />Copyright © 2023 <br />SHEET NUMBER <br />1/4" = 1'-0"6/7/2023 10:31:22 AMREFLECTED <br />CEILING PLAN <br />A1-02CENTIER BANK - SOUTH BENDPERMIT SET FORGAH <br />SRF ASR <br />XX-00 <br />6-6-23 SOUTH BEND, INDIANAA. ALL MECHANICAL AND ELECTRICAL INFORMATION SHOWN ON THE REFLECTED CEILING PLANS <br />MUST BE COORDINATED WITH THE ENGINEERING DRAWINGS. THIS SHEET SHALL TAKE <br />PRECEDENCE OVER THE ENGINEERING DRAWINGS FOR CEILING LAYOUTS. CONTACT THE <br />ARCHITECT TO CONFIRM ANY DISCREPANCIES. <br />B. ALL SPRINKLER HEADS, OCCUPANCY SENSORS, SECURITY DEVICES, SMOKE DETECTORS, <br />SPEAKERS, ELECTRONIC DEVICES, ETC. SHALL BE LOCATED IN CENTER OF TILE U.N.O. <br />C. COORDINATE SPECIAL GYP BRD REQUIREMENTS WITH ARCHITECTURAL FLOOR PLANS. <br />D. COORDINATE CEILING INSTALL WITH OWNER'S IT WORK. <br />E. ALL NEW SUSPENDED ACOUSTICAL CEILING TILE AND GRID TO BE AS FOLLOWS: DUNE SECOND <br />LOOK 2712 W/ PRELUDE XL 15/16" EXPOSED TEE OR EQ.. <br />F. REFER TO FINISH SCHEDULE/COLOR KEY AND INTERIOR ELEVATIONS FOR ADDITIONAL CEILING <br />INFORMATION <br />G. REFER TO ELECTRICAL PLANS FOR DEVICE LOCATIONS, UNDER CABINET LIGHTS, EMERGENCY <br />LIGHTS, VANITY FIXTURES, ETC. <br />H. COORDINATE REINSTALLATION OF EXISTING DEVICES INTO NEW CEILING (SMOKE DETECTION, <br />SPEAKERS, SPRINKLER HEADS, ETC) AS NECESSARY AS PART OF NEW WORK. <br />I. ALL GYPSUM BOARD CEILINGS SHALL BE 5/8" TYPE X GYPSUM BOARD. LEVEL FIVE FINISH. <br />SUSPEND AS REQUIRED UTILIZING METAL STUDS/FURRING/SUSPENSION SYSTEM. <br />CEILING PLAN GENERAL NOTES <br />KEYNOTES <br />1/4" = 1'-0" <br />1 REFLECTED CEILING PLAN <br />1. NEW LED 2x4 LIGHT FIXTURE. <br />2. EXISTING CEILING TO REMAIN. <br />3. NEW 2x2 GRID CEILING IN THIS ROOM. <br />4. BULKHEAD TO REMAIN FROM EXISTING WALL. <br />5. MODIFY EXISTING CEILING TO FIT NEW SPACE. <br />6. OPEN CEILING TO REMAIN. <br />7. EXISTING HIGH WALL (BULKHEAD) TO REMAIN. <br />8. LEAVE TOP PORTION OF WALL TO SERVE AS BULKHEAD. <br />9. NEW CURVED BULKHEAD OVER NEW RECEPTION DESK. <br />10. NEW GYP. BD BULKHEAD.