My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Renovation & Expansion Four Winds Field Proj No. 123-046 – Jones Petrie Rafinski Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Renovation & Expansion Four Winds Field Proj No. 123-046 – Jones Petrie Rafinski Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 9:20:19 AM
Creation date
7/11/2023 1:47:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE OF ARTICLES <br />1 INITIAL INFORMATION <br />2 ARCHITECT'S RESPONSIBILITIES <br />3 SCOPE OF ARCHITECT'S BASIC SERVICES <br />4 SUPPLEMENTAL AND ADDITIONAL SERVICES <br />5 OWNER'S RESPONSIBILITIES <br />6 COST OF THE WORK <br />7 COPYRIGHTS AND LICENSES <br />8 CLAIMS AND DISPUTES <br />9 TERMINATION OR SUSPENSION <br />10 MISCELLANEOUS PROVISIONS <br />11 COMPENSATION <br />12 SPECIAL TERMS AND CONDITIONS <br />13 SCOPE OF THE AGREEMENT <br />ARTICLE 1 INITIAL INFORMATION <br />§ 1.1 This Agreement is based on the Initial Information set forth in this Section 1.1. <br />(For each item in this section, insert the information or a statement such as "not applicable" or "unknown at time <br />ofexecution. ) <br />§ 1.1.1 The Owner's program for the Project: <br />(Inserl the Owner's program, identify documentation that establishes the Owner's program, or state the manner in <br />which the program will he developed.) <br />Areas of scope identified in attached Exhibit A - Scope of Work as described in Four Winds Field Concept Design <br />III document dated 09.26.2022 by Populous. <br />§ 1.1.2 The Project's physical characteristics: <br />(Identify or describe pertinent information about the Project's physical characteristics, such as sae, location, <br />dimensions; geotechnical reports; site boundaries, topographic surveys, traffic and utility studies; availability of <br />public and prtvate utilities andservices; legal description of the site, etc.) <br />See attached Exhibit A. <br />§ 1.1.3 The Owner's budget for the Cost of the Work, as defined in Section 6.1: <br />(Provide total and, if known, a line item breakdown.) <br />Forty million dollars ($40,000,000.00) <br />§ 1.1.4 The Owner's anticipated design and construction milestone dates: <br />.1 Design phase milestone dates, if any: <br />Project Phase l: <br />led Ammmment B133-2019.Copyd9MC2014,aM2019.AIIriphisresewed.'The A,mriom lnsi8ule of Amhiteds,"Amedren lnstiWteofAmhilecb;'AIA; the <br />AIALo9o,and"AIAConb DOCumenteOmtredemaftdThe AmedwnlreMuleofAmLRA .Thgdmumentwaspmmedatll38:41ETon O8130120M 2 <br />under Omer No.2114444856 whits expires on 0713112024, is not for resale, is licensed [Drone -time use only, and may only be used in amomancew0h the AIA <br />( Convect Dnou% s Terms of Servlce. To report mpydBht violations, e-mail dminf0@aiscannelsoom. <br />Usw Notes: (389ADA48) <br />
The URL can be used to link to this page
Your browser does not support the video tag.