My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Renovation & Expansion Four Winds Field Proj No. 123-046 – Jones Petrie Rafinski Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Renovation & Expansion Four Winds Field Proj No. 123-046 – Jones Petrie Rafinski Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 9:20:19 AM
Creation date
7/11/2023 1:47:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
§ 4.2.1 Upon recognizing the need to perform the following Additional Services, the Architect shall notify the Owner <br />with reasonable promptness and explain the facts and circumstances giving rise to the need. The Architect shall not <br />proceed to provide the following Additional Services until the Architect receives the Owner's written authorization: <br />.1 Services necessitated by a change in the Initial Information, previous instructions or recommendations <br />given by the Construction Manager or the Owner, approvals given by the Owner, or a material <br />change in the Project including size, quality, complexity, the Owner's schedule or budget for Cost of <br />the Work, or bid packages in addition to those listed in Section 1.1.6; <br />.2 Making revisions in Drawings, Specifications, or other documents (as required pursuant to Section <br />6.7), when such revisions are required because the Construction Manager's estimate of the Cost of the <br />Work, Guaranteed Maximum Price proposal, or Control Estimate exceeds the Owner's budget, except <br />where such excess is due to changes initiated by the Architect in scope, capacities of basic systems, or <br />the kinds and quality of materials, finishes, or equipment; <br />.3 Services necessitated by the enactment or revision of codes, laws, or regulations, including changing or <br />editing previously prepared Instruments of Service; <br />.4 Changing or editing previously prepared Instruments of Service necessitated by official interpretations <br />of applicable codes, laws or regulations that are either (a) contrary to specific interpretations by the <br />applicable authorities having jurisdiction made prior to the issuance of the building permit, or (b) <br />contrary to requirements of the Instruments of Service when those Instruments of Service were <br />prepared in accordance with the applicable standard of care; <br />.5 Services necessitated by decisions of the Owner or Construction Manager not rendered in a timely <br />manner or any other failure of performance on the part of the Owner or the Owner's consultants or <br />contractors; <br />.6 Preparing digital models or other design documentation for transmission to the Owner's consultants <br />and contractors, or to other Owner- authorized recipients; <br />.7 Preparation of design and documentation for alternate bid or proposal requests proposed by the Owner <br />or Construction Manager; <br />.8 Preparation for, and attendance at, a public presentation, meeting or hearing; <br />.9 Preparation for, and attendance at, a dispute resolution proceeding or legal proceeding, except where <br />the Architect is party thereto; <br />.10 Consultation concerning replacement of Work resulting from fire or other cause during construction; <br />or <br />.11 Assistance in the Initial Decision Maker, if other than the Architect; <br />.12 Services necessitated by replacement of the Construction Manager or conversion of the Construction <br />Manager as constructor project delivery method to an alternative project delivery method; <br />A3 Services necessitated by the Owner's delay in engaging the Construction Manager; <br />.14 Making revisions to the Drawings, Specifications, and other documents resulting from agreed -upon <br />assumptions and clarifications included in the Guaranteed Maximum Price Amendment or Control <br />Estimate; and <br />A5 Making revisions to the Drawings, Specifications, and other documents resulting from substitutions <br />included in the Guaranteed Maximum Price Amendment or Control Estimate. <br />(Paragraphs Deleted) <br />§ 4.2.5Ifthe services covered by this Agreement have not been completed within Twenty-four ( 6 ) months of the <br />date of this Agreement, through no fault of the Architect, extension of the Architect's services beyond that time shall <br />be compensated as Additional Services. <br />ARTICLES OWNER'S RESPONSIBILITIES <br />§ 5.1 Unless otherwise provided for under this Agreement, the Owner shall provide information in a timely manner <br />regarding requirements for and limitations on the Project, including a written program which shall set forth the <br />IDIL AM Document B133-2019. CopyagM®2014, and 2019. All righle meenred.'The Ameremn metro* of Architscls;'American lnsollute of AmotectlWA; the <br />AM Logo, and"AA Convert Documenor are trademarss &rho American Insurers of Architects. This document was pmdoced at 11:3B:41 ETon W30/2023 1B <br />under Order No.2114444858 which expires on 07I3IM24, is not for resale, Is licensed (prone -time use only, and may only he used In accordance with the AM <br />I Convect Documents^Terms of service. To repot copyright violations, e-mail docinfeCaseshracls.mm. <br />uses Notes: (3B9ADA48) <br />
The URL can be used to link to this page
Your browser does not support the video tag.