Laserfiche WebLink
<br /> <br />Page 7 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />manager to review design-related questions and construction conflict or issue resolution. <br />Additional trips may be provided as a supplemental service. <br />The Engineer shall not have responsibility for the superintendence of construction site conditions, <br />safety, safe practices or unsafe practices or conditions, operation, equipment, or personnel other <br />than employees of the Engineer. This service will in no way relieve the Contractor of complete <br />supervision of the Work or the Contractor’s obligation for complete compliance to the Contract <br />Documents. The Contractor shall have sole responsibility for safety and for maintaining safe <br />practices and avoiding unsafe practices or conditions. <br />Task 306 – Final Inspection <br />Upon substantial completion, Engineer will conduct an inspection of the project site and prepare a <br />punchlist of items to be completed or corrected by the Contractor before final completion of the <br />project. Engineer will submit results of the inspection to the Owner and Contractor. Upon <br />completion or correction of the items of work on the punch list, Engineer will conduct one final <br />inspection to determine if the work is completed and provide written recommendations to the <br />Owner concerning final payment including a list of items, if any, to be completed prior to the <br />making of such payment. Inspections will be conducted by the engineering manager. <br />Task 307 – Revise Construction Contract Drawings <br />Upon completion of the project, Engineer will revise the construction contract drawings to <br />conform to the construction records. Revisions to the construction contract drawings will be <br />provided by the Contractor for editing by the Engineer. An electronic copy in AutoCAD and PDF <br />formats of the conformed-to-construction drawings will be provided to the Owner. <br /> <br />b. The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: <br /> <br />c. The responsibilities of Owner are modified as follows: <br /> <br />d. For the Additional Services or the modifications to services set forth above, <br />Owner shall pay Engineer the following additional or modified compensation: <br /> <br />For Professional Services described under Paragraph 2.a. to add additional scope <br />under Tasks 101, 201-205, and 301-307, Owner agrees to pay Engineer in <br />accordance with the Agreement for Professional Services on a Standard Hourly <br />Rate Basis. The total compensation for Amendment 1 shall increase the not to <br />exceed amount by $182,455 and shall not be revised without written <br />authorization. <br /> <br />e. The schedule for rendering services is modified as follows: <br />