Laserfiche WebLink
<br /> <br />Page 3 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />• Site Plan <br />• Erosion and Sediment Control Details <br />• Civil Details <br />Structural <br />• Structural Legends and General Notes <br />• Electrical Switchgear Structural Plan and Sections <br />• Structural Details <br />Electrical <br />• Electrical Legends <br />• Electrical Abbreviations and Notes <br />• Site Plan (1 of 2) <br />• Site Plan (2 of 2) <br />• Power Distribution Functional Diagram <br />• Schematic Diagrams <br />• Electrical Details (1 of 2) <br />• Electrical Details (2 of 2) <br /> <br />Contract Documents will be reviewed by senior engineers for quality assurance. The review will <br />cover conformance to standards, completeness, adherence to sound engineering practices, and <br />constructability. <br />Deliverables for the project include: <br />Basis of Design Memorandum / 50 Percent Design Deliverable <br />• Draft Basis of Design Memorandum <br />• Preliminary Construction Sequencing Plan <br />• Civil Plans, Sections and Details <br />• Structural Plan, Sections and Details