Laserfiche WebLink
WHEREAS, the Owner now plans to develop a larger, more comprehensive project expanded beyond <br />and encompassing these project limits where the services of the Engineer will not be required. <br />NOW, THEREFORE, it is agreed by and between the Owner and Engineer that the following Articles in <br />the agreement are amended, deleted, or changed: <br />CHANGE Article A1.02 Conceptual Corridor Improvement <br />C. The Engineer shall develop a conceptual drawing for review and comment by the Owner based <br />on scope meeting input and the city consultant's conceptual drawing. The Engineer shall <br />conduct a three 3 review meetings to receive conceptual drawing comments. Engineer shall <br />investigate rear angle parking, flush edge curbing, center parking, ramps impacts, construction <br />estimates, and the signal warrant at Mishawaka Avenue and Bever/Longfellow. <br />D. The Engineer shall coordinate and perform a project site meeting three (3) times with Owner <br />staff, utilities and other identified stakeholders for the proposed corridor Road Diet <br />improvements, bicycle and pedestrian access, intersection signal modernization, and other <br />improvements or changes. <br />The conceptual drawing shall be updated by the Engineer from comments received at the site <br />meeting. Engineer shall develop three 3 concepts based on comments received. The finalized <br />conceptual drawing shall be the basis of design for subsequent project development phases. <br />F. Develop a three 3 presentation drawings for use during public meetings in general accordance <br />with public hearing visual design preparation guide. <br />CHANGE Article C2.01 B. 1. Compensation: <br />a. Topographic Survey <br />b. Conceptual Corridor Plan <br />c. Public Engagement <br />d. Road Plan Development (thru Grade Review) <br />Agreement Summary: <br />$ 46,600 (LSUM) <br />w,600 ( SUM) 33,536.33 (LSUM) <br />e4 Qnn ri s m- 19,096.00 [LSUM <br />Original agreement amount: $ 106,000.00 <br />Net change for prior amendments: $ 0.00 <br />This amendment amount: (6,767.67) <br />Adjusted Agreement amount: $ 99,232.33 <br />Change in time for services (days or date, as applicable): 0 <br />The foregoing Agreement Summary is for reference only and does not alter the other terms of the <br />Agreement, including those set forth in Exhibit C. <br />Exhibit K — Amendment to Owner -Engineer Agreement. <br />EJCDC® E-500, Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. Page 2 <br />