My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - Coal Line Trail, Phase IIB Proj No. 122-035 - INDOT Milestone Contractors
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 2 - Coal Line Trail, Phase IIB Proj No. 122-035 - INDOT Milestone Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 12:11:37 PM
Creation date
7/11/2023 1:45:09 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:B -44292 INDIANA <br />Change Order No:002 Department of Transportation <br />Contract: B -44292 <br />Project: 2200199 - State: 220019900LC4 <br />Change Order Nbr: 002 <br />Change Order Description: Upsizing in railing post size due to clearance issues <br />Reason Code: CHANGED COND, Constructability Related <br />CLN PCN PLN Item Code Unit Unit Price CO City Comment <br />0016 2200199 0016 601-03667 LFT 300.000-738.000 C <br />Item Description: RAILING ORNAMENTAL <br />Supplemental Descriptionl: <br />Supplemental Description2: <br />Date:04/26/2023 <br />Page: 3 <br />Amount Change <br />Amount:$-221,400.00 <br />0082 2200199 0082 601-03667 LFT 331.550 738.000 C Amount:$ 244,683.90 <br />Item Description: RAILING ORNAMENTAL <br />Supplemental Description1: Railing change <br />Supplemental Description2: <br />Total Value for Change Order 002 = $ 23,283.90 <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />The posts needed to be upsized to accept the conduit and the sweeps needed to get the conduit from between both bridge mats and into the <br />post. Originally the posts were 5x5 and they are being upgraded to 5x7. In addition the added size allows for the wires to be connected to the <br />wires from the recessed light fixture in the post via a small access door which was needed to allow for connections and to pull the wire from post <br />to post. <br />Change Order Explanation for Specific Line Item <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor: <br />Milestone Contractors North Signed By: G ( ' <br />" <br />Date: 4/26/2023 <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.