My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - 2022 Contractor Paving, Round III Proj No. 122-048 - Reith-Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 2 - 2022 Contractor Paving, Round III Proj No. 122-048 - Reith-Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 1:45:09 PM
Creation date
7/11/2023 1:45:05 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />INTER-OFFICE MEMORANDUM <br /> <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br /> <br /> <br />TO: Theresa Heffner, Clerk <br />Board of Public Works <br />FROM: Scott Kreeger, Project Engineer <br />SUBJECT: 122-048 <br />2022 Contractor Paving Round 3 CO#2 <br />DATE: 6/22/2023 <br />Change order #2 for the 2022 Contractor Paving Round 3 project includes the additional costs <br />due to the discovery of the unmarked Choice light conduit, addition of pedestrian push buttons, <br />and the new striping configured for Miami Street. A complete breakdown of the costs along with <br />a brief description of the work will be included in an attachment to this memo. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.