My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Coal Line Trail, Phase IIB Proj No. 122-035 - INDOT Milestone Contractors
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 1 - Coal Line Trail, Phase IIB Proj No. 122-035 - INDOT Milestone Contractors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 12:10:27 PM
Creation date
7/11/2023 1:44:15 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:B -44292 INDIANA <br />Change Order No:001 Department of Transportation <br />Contract: B -44292 <br />Project: 2200199 - State: 220019900LC4 <br />Change Order Nbr: 001 <br />Change Order Description: Alternate Curing Method for Structural Concrete using E5 <br />Reason Code: SCOPE CHANGES, Material Related <br />CLN PCN PLN Item Code Unit Unit Price CO Qty Comment <br />0046 2200199 0046 704-51002 CYS 3,500.000-125.000 C <br />Item Description: CONCRETE, C, SUPERSTRUCTURE <br />Supplemental Descriptionl: <br />Supplemental Description2: <br />0081 2200199 0081 704-51002 CYS 3,500.000 125.000 C <br />Item Description: CONCRETE C SUPERSTRUCTURE <br />Supplemental Descriptionl: E5 internal cure <br />Supplemental Description2: <br />Date:04/26/2023 <br />Page: 3 <br />Amount Change <br />Amount:$-437,500.00 <br />Amount:$ 437,500.00 <br />Total Value for Change Order 001 = $ 0.00 <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />This is a zero dollar change order. Milestone submitted a request to use an Alternate Curing Method for Structural Concrete using E5 Internal <br />Cure per Construction Memo 22-02. Mix option 1 was requested and was approved by USI, City of South Bend and INDOT. This will be utilized <br />for the Concrete C Superstructure. No additional time will be added to this change order. There are no additional consts for the change in the <br />concrete mix design. <br />Change Order Explanation for Specific Line Item <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor: Milestone Contractors North signed By: f , i t 16, <br />4/26/2023 <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.