49SOUTH BEND, INDIANA GSC <br />D. PERFORMANCE BOND AND PAYMENT BOND <br />Kokosing will furnish a performance bond and payment bond each in the amount of 100 percent of the <br />project. A letter from our bonding company follows this section that states that we have the financial <br />standing and backing required for this project. Kokosing has a total bonding capacity exceeding $3 <br />billion. We have the strength and stability that comes from a successful 72 years in business. <br />Once in construction, we continue to communicate frequently with our vendors and manufacturers, <br />integrating updated information into our project plan and schedule. In the event delays are expected, <br />we actively seek out alternative supply sources and, if applicable, work with our Owners and Engineers <br />to evaluate the merits of changing products. <br />TABLE 6-2 CONTINGENCY TABLE <br />ITEM ADD/(REMOVE) TO <br />CONTINGENCY <br />NEW CONTINGENCY <br />BALANCE COMMENTS STATUS <br />REMOVE site fencing for <br />{Location 1} WTP.$10,000.00 $47,000.00 SCOPE MOD 1 Complete <br />Install plywood between new <br />electrical building addition and <br />existing switchgear room. <br />($3,500.00)$43,500.00 SCOPE MOD 2 Complete <br />Add nuetral conductor to outdoor <br />weather proof portable generator <br />cabinet. <br />($1,308.00)$42,192.00 SCOPE MOD 3 Complete <br />At {Location 1}, install conduit and <br />wire to pump #3 motor starter to <br />Toric panel, install conduit and <br />wire from Aerator to Toric Panel, <br />and replace existing cable to <br />pressure gauge. <br />($2,335.00)$39,857.00 SCOPE MOD 3 Complete <br />At {Location 2} Wells, install <br />ground rod for existing service <br />and existing antenna mast and <br />seperate ground and nuetral in <br />power supply. <br />($1,275.00)$38,582.00 SCOPE MOD 3 In Progress