My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:09:44 AM
Creation date
7/11/2023 1:41:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 6-2 CONTINGENCY TABLE <br />ITEM 9PUDD/(REMOVE)TOEW CONTINGENCY COMMENTS <br />It 1JfF <br />STATUSNTINGENCY <br />BALANCE <br />REMOVE site fencing for $47,000.00 SCOPE MOD 1 <br />{Location 1 } WTP. <br />Complete <br />Install plywood between new <br />electrical building addition and 0 0 <br />existing switchgear room. <br />11 <br />SCOPE MOD• <br />. - - <br />Add nuetral conductor to outdoor <br />weather proof portable generator ($1,308.00) <br />cabinet. <br />142,1112,10 <br />SCOPE MOD I <br />Complete <br />At {Location 1}, install conduit and <br />wire to pump #3 motor starter to <br />Toric panel, install conduit and i <br />SCOPE MOD 3 <br />Complete335.00) <br />wire from Aerator to Toric Panel, <br />and replace existing cable to <br />pressure gauge. <br />At {Location 2} Wells, install <br />ground rod for existing service <br />and existing antenna mast and ($1,275.00) <br />seperate ground and nuetral in <br />power supply. <br />SCOPE MOD 3 <br />In Progress <br />D. PERFORMANCE BOND AND PAYMENT BOND <br />Kokosing will furnish a performance bond and payment bond each in the amount of 100 percent of the <br />project. A letter from our bonding company follows this section that states that we have the financial <br />standing and backing required for this project. Kokosing has a total bonding capacity exceeding $3 <br />billion. We have the strength and stability that comes from a successful 72 years in business. <br />Once in construction, we continue to communicate frequently with our vendors and manufacturers, <br />integrating updated information into our project plan and schedule. In the event delays are expected, <br />we actively seek out alternative supply sources and, if applicable, work with our Owners and Engineers <br />to evaluate the merits of changing products. <br />SOUTH BEND, INDIANA GSC 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.