My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:09:44 AM
Creation date
7/11/2023 1:41:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend WWTP EQ Basin Clarifier Project <br />HID23058 <br />Primary Baseline View <br />10-Jul-23 13:45 <br />ityD A lti Name bt Fnish <br />Durefian <br />Juy2023 <br />A O N D J M AW12024 MW2024 J Ju1y2024 A <br />ey <br />J My2025 A J I W J My2026 A <br />0101112121011111210111112131011121210111112101011121310111 <br />South Bend NMITP EQ Basin & Clarifier Project 635 02-Jun-23 A 26-Dec-25 <br />Contract Milestones ad 628 11-Jul-23 26-Dec- <br />CM1010 GSC RFP Submission Due from Providers 0 11-Jul-23 <br />_CM1020 GSC Provider Selection 01 08-Au -23 <br />CM1030 BPW Contract Approval 0 22-Au -23 <br />I26-Dec-25, outh bend VVVVTP Basin Ulantier proy <br />26-Dee-25, Contract Milestones <br />• GSC RFP Submission Due from Providers <br />GSC Provider Selection <br />• BPW Contract Approval <br />-- I--------- -------+--o--�i' - - - -------- ---------i------- ------------- - ----- --- ---- ----- ----- _ ---- • ----------- ----- ---- ---- ----- ------ --- ----- ---- ----- _ ---- ---- ----- ---- - ------ ---- <br />r.90 % Des n Milestgne + +, • <br />9 <br />t IFC Documents Complete <br />• IDEM Permitting',Approgal <br />• Clarifier Substantial, Completion <br />*::EQ Basin Substantial Con pletion <br />-------- -I --------- -I -------------------+------- ----------------- ---- ---- ------------ •------- --- ------------- ------ ---- -------------- ------ - ----- ---- -- ------ - ------ - ;Pro P <br />' I I =I ; ; ; i I ject Final Com jetion ; ; <br />09-Nov-23, GSC:Contrect Procurement <br />111111111111 GSC Solicitation; Period <br />r:i BPW GSC Review and Selection Period <br />OPW GSC Contract Review <br />- - ----- --•- - > i <br />-------- i - <br />GMP Notice to Proceed <br />: 30-Dec-23, Engineering 8� Desigh <br />•, 90% Design Document Development <br />90% Design Review <br />90% GMP: Budget Estimating $ VE •, <br />• <br />r - -- : - ------------------ ---- ---- - ----- •------- • ----- ----- ---- ---- -------------- --- ----- ---- ----- •-------- ---- ----- ---- -- ------ - ------ <br />I ID�M Permlttm 9 <br />�, 100% IFC Document Development <br />NDPES Permitting <br />�' Local';Permitting <br />26-Dec-25, Administrative:: <br />..•....-..... y-......-. �.........:.......... i.......... _..-.............-......-.-....-.-,...-.-... �..........;.......... t-------... •..------- ,.....-...;........- , ..... , - ...- - .-.-. -..... -..... ...- -.-.. - ...-.- ...-. .... ..... - ..-.. - .....- , .... -.... .-.. - .....- -.-.. - -.-.- - --.-.- - - <br />27-Fe24, Procurement Subcpntracting <br />Purchase EQ Storage Basin Tank <br />Purchase Pumps and Accessories', <br />o Purchase Concrete and Rebar <br />o Issue D'ewatering Subcontract <br />_ • <br />---------- h------------------+ -- ' i _---------- ------------------------- ---- ---- --------------_-------- _ --- -------------------- ---- ---- ---------------------- ------ ---- ----- _ --- ---- - ---- ----- ---- - ---- ----- - <br />v Issue E ectnc�l SubGonfra <br />: : cm Issue Ir strumgntation/Controls PQ <br />v Purchase Generatoriand ATS <br />o Purchase Cladfier Equipment <br />o Purchase:Ductile Iron Riping and Acciessories <br />---------------------<----------i--------- ----------+------------------------------------ <br />staff-c nd M chani I Bar' - i <br />Purchase)a e Ca Screens <br />: : Purchase RCP; Piping; and Accessories <br />Purchase Basin Flushing Equipment <br />Purchase Gates and Accessories <br />Issue) Masonry Subcontract <br />•---------- ------------------4--------- _ ---- - ----------_--- --------- -- ------------ • ------------------ ------ ---- -------------- ------ ----- ---- ----- _-------- ---- ----- ---- -- ------ - ------ - <br />+ - -- <br />: Purchase Grating and andrail <br />Issue Ropfing Subcontract <br />: o Issue Coatings Subcontract <br />o Issue HVAC/P Subcontract <br />v Issue Asphalt Subcontract <br />-......- -- -- ----- ------ --------- - -------------------- ------ ---- -------------- ------ ----- ---- ------ _-------- ---- ----- ---- -- ------ - ------ --------', GontraG .. ..;... - •- - <br />: Issue Seedin Sub t <br />g <br />02-Apr-24, Submittals <br />Prepare & Submit <br />�', Pump and Accessory Submittals <br />0l Concrete/Rebar Submittals <br />- - - - 1-- -- --- -- - - - -- - - - - - - <br />Dewaterin <br />', ', g 1=ngineerin $ubmit�al ; T <br />:] Electrical $ubmittals <br />Instrumentation/Controls Shop':Drawings <br />o Generator/ATS Submittals', <br />o Clarifier; Equipment Submittal Package <br />• •-------- -----------1 _-------- _ ` - - -- +-------- ---- ---- ------------ -------- • ------------------ ------ ---- -------------- ------ - ---- ----- _-------- ---- ----- ---- -- ------ - ------ <br />E Q Storage Basin Shqp Drawings - 1 <br />� DIP', Piping; Submittals &',Accessories <br />: Static and Mech Bar Screen Submittals <br />RCP Piping/Structure Submittals <br />4 Gate and Accegsory Submittals <br />-------- -----------1 _----------------------- ---- - ------ - - <br />Basin,Flushing Equipment SubrrHttals <br />� Masonry Submittals <br />: Grating and Handrail Submittal'; <br />Roofing Submittal <br />�I, Coatings Submittal' <br />-------------------- ---------+---------- --- -- --- ---- ---- ---------- _-------- _ ----- --------------------- ---- -------------- ------ - ---- ------ _---------- ----- ----- ----- ------------ ---------- <br />---' HVgC/PStbm1611 <br />I I I /asphaltSubmittals I I I I I I <br />: Seeding/Restoration Submittals <br />02-Apr-24, Review & Approve <br />Review Generator/ATS Submittals <br />CM1040 <br />tr <br />90% Design Milestone <br />0 <br />27-Se 23 <br />CM1060 <br />IFC Documents Complete <br />0 <br />30-Nov-23 <br />CM1070 <br />IDEM Permitting Approval <br />0 <br />11-Deo-23 <br />CM1100 <br />Clarifier Substantial Completion 0 <br />EQ Basin Substantial Completion 0 <br />Project Final Completion 0 <br />93 <br />GSC Solicitation Period 20 <br />BPW GSC Review and Selection Period 20 <br />BPW GSC Contract Review 10 <br />02-Jun-23 A <br />02-Jun-23 A <br />12-Jul-23 <br />28-Oct-25 <br />CM1080 <br />26-Nov-25 <br />26-Dec-25 <br />09-Nov-23 <br />11-Jul-23 <br />108-Aug-23 <br />CM1090 <br />GSC Contract Procurem <br />P1000 <br />P1010 <br />P1020 <br />P1030 <br />Engineering &Design <br />ED1000 <br />09-Aug-23 <br />22-Aug-23 <br />GMP Notice to Proceed 1 09-Nov-23 09-Nov-23 <br />90 23-Aug-23 30-Dec-23 <br />90% Design Document Development 25 23-Aug-23 27-Sep-23 <br />ED1060 <br />90% Design Review <br />10 <br />28-Sep-23 <br />11-Oct-23 <br />ED1010 <br />90% GMP Budget Estimating & VE <br />IDEM Permitting60 <br />20 <br />12-Oct-23 <br />12- Oct -23 <br />08-Nov-23 <br />10-Dec23 <br />ED1040 <br />ED1030 <br />100% IFC Document Development <br />15 <br />09-Nov-23 <br />30-Nov-23 <br />ED1050 <br />ED1080 <br />Administrative <br />PrecurementB Submntractrn g <br />PS1020 <br />PES Permitting <br />NDS1130 <br />30 09-Nov-23 08-Dec-23 <br />30 01-Dec-23 30-Dec-23 <br />522 11-Dec-23 26-Dec-25 <br />55 11-Dec-23 27-Feb-24 <br />15 11-Dec-23 02-Jan-24 <br />Local Permittin <br />Purchase EQ Stora a Basin Tank <br />PS1060 <br />Purchase Pumps and Accessories <br />10 11-Deo-23 <br />22-Dec-23 <br />PS1070 <br />Purchase Concrete and Rebar <br />Issue Dewatering Subcontract <br />Issue Electrical Subcontract <br />10 11-Dec-23 <br />10 11-Dec-23 <br />10 11-Dec23 <br />22-Dec-23 <br />22-Dec-23 <br />22-Dec23 <br />PS1100 <br />PS1140 <br />PS1150 <br />Issue Instrumentation/Controls PO <br />Purchase Generator and ATS <br />Purchase Clarifier Equipment <br />10 <br />11-Dec23 <br />22-Deo-23 <br />22-Dec-23 <br />PS1160 <br />10 <br />11-Dec-23 <br />Psi 190 <br />10 <br />11-Dec-23 <br />22-Dec-23 <br />PS1010 <br />PS1050 <br />Purchase Ductile Iron Piping and Accessories <br />Purchase Static and Mechanical Bar Screens <br />Purchase RCP Piping and Accessories <br />10 26-Deo-23 09-Jan-24 <br />10 26-Dec23 09-Jan-24 <br />10 03-Jan-24 16-Jan-24 <br />PS1000 <br />PS1030 <br />Purchase Basin FlushingEquipment <br />15 <br />03-Jan-24 <br />23-Jan-24 <br />PS1040 <br />Purchase Gates and Accessories <br />10 <br />03-Jan-24 <br />16-Jan-24 <br />PS1090 <br />PS1080 <br />Issue Mason Subcontract <br />Purchase Gratin and Handrail <br />10 <br />10 <br />17-Jan-24 <br />24-Jan-24 <br />30-Jan-24 <br />O6-Feb-24 <br />PS1110 <br />Issue Roofing Subcontract <br />10 <br />31-Jan-24 <br />13-Feb-24 <br />PS1120 <br />Issue Coatings Subcontract <br />10 <br />31-Jan-24 <br />13-Feb-24 <br />PS1130 <br />Issue HVAC/P Subcontract <br />10 <br />31-Jan-24 <br />13-Feb-24 <br />PS1170 <br />Issue Asphalt Subcontract <br />10 <br />14-Feb 24 <br />27-Feb-24 <br />PS1180 Issue SeedingSubcontract 10 14-Feb-24 27-Feb-24 <br />SU _ 70 26-Dec-23 02-Apr-24 <br />S1060 <br />S1070 <br />S1100 <br />Pump and Accessory Submittals 25 26-Dec-23 30-Jan-24 <br />Concrete/Rebar Submittals 25 26-Dec-23 30-Jan-24 <br />Dewaterin Engineering/Submittal 25 26-Deo-23 30-Jan-24 <br />S1140 <br />Electrical Submittals <br />30 <br />26-Dec23 <br />06-Feb-24 <br />S1150 <br />Instrumentation/Controls ShopDrawings <br />30 <br />26-Dec23 <br />06-Feb-24 <br />S1160 <br />Generator/ATS Submittals <br />20 <br />26-Dec-23 <br />23-Jan-24 <br />S1190 <br />S1020 <br />Clarifier Equipment Submittal Package <br />EQ Storage Basin ShopDrawings <br />40 <br />30 <br />26-Deo-23 <br />03-Jan-24 <br />20-Feb-24 <br />13-Feb-24 <br />S1010 <br />DIP Piping Submittals & Accessories <br />Static and Mach Bar Screen Submittals <br />20 <br />10-Jan-24 <br />06-Feb-24 <br />06-Feb-24 <br />S1050 <br />20 <br />10-Jan-24 <br />S1000 <br />RCP Piping/Structure Submittals <br />15 <br />17-Jan-24 <br />06-Feb-24 <br />S1040 <br />S1030 <br />Gate and AccessorySubmittals <br />Basin FlushingEquipment Submittals <br />20 <br />25 <br />17-Jan-24 <br />24-Jan-24 <br />13-Feb-24 <br />27-Feb-24 <br />S1090 <br />Mason Submittals <br />15 <br />31-Jan-24 <br />20-Feb-24 <br />S1080 <br />Gratin and Handrail Submittal <br />20 <br />07-Feb-24 <br />05-Mar-24 <br />S1110 <br />Roofing Submittal <br />15 <br />14-Feb-24 <br />05-Mar-24 <br />S1120 <br />Coatings Submittal <br />HVAC/PStbmdtal <br />10 <br />1514-Feb24 <br />14-Feb-24 <br />27-Feb-24 <br />05Mar-Mar <br />S1170 <br />Asphalt Submittals <br />15 <br />28-Feb-24 <br />19-Mar-24 <br />S1180 <br />Seeding/Restoration Submittals <br />15 <br />28-Feb-24 <br />19-Mar-24 <br />0 <br />if <br />RA1160 <br />Review Generator/ATS Submittals <br />I 10 <br />24-Jan-24 <br />06-7eb-24 <br />01111--1 Actual Work Critical Remaining Work Summary <br />0 Remaining Work ♦ ♦ Milestone <br />Page 1 of 5 <br />TASK filters: In Progress, Not Started. <br />© Oracle Corporation <br />
The URL can be used to link to this page
Your browser does not support the video tag.