My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Kokosing Ind.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 1:41:59 PM
Creation date
7/11/2023 1:41:21 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
25 <br />CITY OF TOLEDO AND TOLEDO WATERWAYS INITIATIVE <br /> Ottawa River Storage Facility <br />Toledo, OH <br />PROCUREMENT METHOD <br />Design-Bid-Build <br />CONTRACTING METHOD <br />Lump Sum <br />TOTAL CONTRACT VALUE <br />$69,000,000 <br />SELF-PERFORM TRADE <br />• Excavation and Sitework <br />• Buried Utilities <br />• Piling <br />• Concrete <br />• Process Equipment Install <br />SUBCONTRACT TRADES <br />• Steel Erection <br />• Hauling <br />• Electrical <br />• I&C <br />• HVAC & Plumbing <br />• Landscape / Park <br />OWNER’S CONTACT <br />Ed MooreDirector of Public Utilities419.245.1847ed.moore@toledo.oh.gov <br />Kokosing was successful low bidder to become the General <br />Contractor for this unique project that combined heavy civil <br />construction with space making for the neighborhood. This project <br />was under a timeline driven by the Combined Sewer Overflow <br />(CSO) Consent Decree. <br />This project consisted of two main elements: the pumping station, <br />storage basin and park restoration work; and conveyance and <br />roadway improvement work. <br />The pumping station, storage basin and park restoration work <br />consisted of: <br /> •Construction of a 36.3 million gallon underground concrete <br />wastewater storage basin <br /> •Construction of a 172 MGD capacity pumping station <br />The Storage Basin Influent Pump Station included: <br /> •6 bar screens upstream of the pumps, each 9’-2” wide X 32’- <br />6” Tall <br /> •Serviced by OVIVO Sewage Bosker Raking Machine that <br />operated from an overhead trolley. <br /> •Each stainless steel bar screens were designed for a peak flow <br />of 60 MGD <br />The conveyance and roadway improvement work consisted of: <br /> •Construction of pipelines, diversion and outfall structures <br />necessary to divert sewer system overflows to the pumping <br />station and storage basin and return the diverted wastewater <br />from the storage basin to the sewer system <br /> •Separation of combined sewers by the construction of new <br />storm sewers <br /> •Restoration and reconstruction of roadways affected by the <br />above items <br />The park restoration work consisted of: <br /> •Earthwork to cover the tank and establish finished grade <br /> •Construction of baseball field with bleachers, tennis courts, <br />and playground area with picnic pavillion <br /> •Construction of parking areas and paved trails <br />Winner of the <br />Build Ohio Award <br />Industrial Heavy <br />AGC 2018
The URL can be used to link to this page
Your browser does not support the video tag.