My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2023 1:41:20 PM
Creation date
7/11/2023 1:40:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Northern-Based Project Team <br />Proven Experience at Your Facilities & On-time Well Delivery <br />History of Collaboration with South Bend & your Engineers <br />#1 Water/Wastewater GSC Provider in Indiana <br />3c) Providers shall demonstrate their understanding of the Project. <br />3d) Providers are required to detail their plan to construct the Project. This plan shall include construction approach for components such as, but not limited to: equipment, structure, and material procurement; utility coordination and acquisition of temporary electrical power; <br />site dewatering; demolition; excavation means and methods; combined sewer flow bypass plan that maintains flow to the WWTP (<77 MGD) and allows for appropriate combined sewer overflows (>77 MGD); structure and piping construction sequence; equipment <br />installation; startup and testing; paving; and site restoration. <br />3e) Providers shall provide their approach to minimize the construction timeline and submit a construction schedule. The construction must be completed by the City’s Long Term Control Plan compliance deadline of December of 2025. The system must be operational by this <br />deadline.
The URL can be used to link to this page
Your browser does not support the video tag.