Laserfiche WebLink
Northern-Based Project Team <br />Proven Experience at Your Facilities & On-time Well Delivery <br />History of Collaboration with South Bend & your Engineers <br />#1 Water/Wastewater GSC Provider in Indiana <br />3a) The scope of the Project will be based on the document provided by the Owner in Exhibit A. <br />3b) Providers are encouraged to present evidence of their team’s technical ability relative to such anticipated scope of work by providing a list of water and wastewater experience of the team. <br />Pat Stanford’s team has extensive experience with critical wastewater infrastructure projects <br />throughout Northern Indiana, including having executed projects on South Bend’s infrastructure. <br /> <br />Please refer to the Execution Plan documents in the following pages for an overview of our planned <br />approach for your future GSC projects, as well as an overview of our history with your engineering <br />partners, American Structurepoint and Arcadis. We have identified a high-level work sequence, <br />manpower estimates, equipment, challenges and risks, opportunities, preliminary VE concepts and <br />critical path deliveries. As the project advances, we will continue to develop our detailed execution <br />plans to ensure South Bend’s goals are met at every phase. Following our execution plans, you will <br />find an extensive list of recent projects from our Northern Indiana office showing Bowen’s regional <br />experience and competitiveness. <br /> <br />Bowen’s approach to project management has always been one of communication, collaboration, <br />and cooperation. Our rich history of partnership with the South Bend team, proximity as a local <br />contractor and experience with your engineers and plant staff will further enhance your projects. <br />What sets Bowen apart from other contractors is that the team has a broad range of self-performing <br />capabilities, including: Dewatering, Sheet Piles, Site-Work, Concrete, Equipment and Mechanical <br />and Piping Systems. These self-performing capabilities will further reduce the job costs for South <br />Bend while giving our project team more control over the outcome of your project. <br /> Because of the complex nature of infrastructure projects, unforeseen challenges will always <br />take place. The Bowen team is committed to recognizing problems early and taking swift, <br />appropriate corrective action. This behavior has become one of Bowen’s core values: “Never walk <br />away from a problem.” <br />We recognize and share South Bend’s desire to do all we can to achieve the project goals. In today’s <br />economic climate, a major contributor to minimize the construction timeline and cost control success <br />is a well-developed procurement plan. During project kickoff and storyboarding sessions, the team <br />will continually refine the approach to procurement. <br />Refer to the next page to see Bowen’s Northern Indiana Experience since 2011. <br />TECHNICAL APPROACH