My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Qualifications - WWTP CSO Tank RFQ Guaranteed Savings Contract Proj No. 121-071-A - Bowen Enigneering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:07:10 AM
Creation date
7/11/2023 1:40:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of South Bend PROJECT SCOPE <br />GSC Pinkhook WTP Improvements / South Bend, IN <br />Project Size: $1,785,000 / February 2021 - January 2022 • Filter Rehabilitation <br />• Valve Replacement <br />The Pinhook Water Treatment Plant was experiencing several issues related to • Ceearwell Cleaning <br />aging filters and equipment and selected selected Bowen to update and repair • I&C Allowance - $10,000 <br />the plant. This process involved completing filter rehabilitation by removing the <br />existing media, cant strips, and caps and then installing a new IMS 200 caps, PROJECT SPECS <br />cant strips, and reinstalling the existing media after its been fixed. In addition, <br />Bowen replaced several valves and actuators, and cleaned the clearwell. <br />• Install new cap and cant strip <br />Project Challenges: • Install new filter media <br />• Bowen completed all changes while working in an active facility • Replace valves <br />• Replace actuators <br />Bowen Resourceful: <br />• Utilized craft's expert knowledge to discover problematic areas within plant PROD ECT TEAM <br />and fix them efficiently <br />Bowen Responsive: • Project Manager: Pat Stanford <br />Stull <br />S <br />• Bowen collaborated closely with owner to create a plan of action in solving . Superintendent: Tony • Project Engineer: Mitchell l <br />WTP issues Abitua <br />• Engineering: American Structurepoint <br />• City of South Bend Contact: <br />Bowen Results: • Bowen overcame schedule / budget constraints to successfully achieve Bradley VanOosterum - 574.233.0311 <br />the project on time, and returned savings back to the City. <br />B EN <br />RESOURCEFUL. RESPONSIVE. RESULTS. <br />www.bowenSQP.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.