Laserfiche WebLink
j1 tf{ <br />QUOTE/PROPOSAL <br />CITY OF SOUTH BEND .F~ <br />PROJECT NAME Central Services Parking Lot Repairs <br />PROJECT NO. 122-064R <br />QUOTES DUE July 11th, 2023 at 9:00am (Local Time) <br />Base Quote <br />Line Item <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />1 <br />Mobilization & Demobilization <br />1 <br />LS <br />$11,200.00 <br />$11,200.00 <br />2 <br />Excavation, Common <br />178 <br />CYS <br />$85.86 <br />$15,283.08 <br />3 <br />Subgrade Treatment, Type II <br />244 <br />SYS <br />$78.36 <br />$19,119.84 <br />4 <br />Milling, 1.5" <br />5760 <br />SYS <br />$4.75 <br />$27,360.00 <br />5 <br />HMA Surface, 9.5 mm <br />499 <br />TON <br />$136.50 <br />$68,113.50 <br />6 <br />HMA Intermediate, 12.5mm <br />35 <br />TON <br />$200.63 <br />$7,022.05 <br />7 <br />Joint Adhesive <br />2240 <br />LIFT <br />$1.00 <br />$2,240.00 <br />8 <br />Concrete Curb, Installation <br />200 <br />LIFT <br />$68.35 <br />$13,670.00 <br />9 <br />Structure, Dry Well, 1800 Gal. <br />2 <br />EA <br />$16,284.16 <br />$32,568.32 <br />10 <br />Pipe, Circular, 24 in., Perforated <br />97 <br />LIFT <br />$301.30 <br />$29,226.10 <br />BASE QUOTE TOTAL <br />$225,802.89 <br />Alternate No. 1 <br />Line Item <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />$4.19 <br />$6,075.50 <br />1 <br />Milling, 1.5° <br />1450 <br />SYS <br />$141.77 <br />$17,863.02 <br />2 <br />HMA Surface, 9.5 mm <br />126 <br />TON <br />$1.00 <br />$840.00 <br />3 <br />Joint Adhesive <br />840 <br />LIFT <br />$25,433.72 <br />ALTERNATE NO. 1 TOTAL <br />Version 03/15/2023 Page - 24 Public Works Quote <br />