Laserfiche WebLink
PROJECT NAME <br />PROJECT NO. <br />QUOTES DUE <br />Base Quote <br />QUOTE/PROPOSAL <br />CITY OF SOUTH BEND <br />Central Services Parking Lot Repairs <br />122-064R <br />July 11th, 2023 at 9:00am (Local Time) <br />Line Item <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />1 <br />Mobilization & Demobilization <br />1 <br />LS <br />12,234.00 <br />$12,234.00 <br />2 <br />Excavation, Common <br />178 <br />CYS <br />38.00 <br />$6,764.00 <br />3 <br />Subgrade Treatment, Type II <br />244 <br />SYS <br />25.00 <br />$6,100.00 <br />4 <br />Milling, 1.5 <br />5760 <br />SYS <br />4.30 <br />$24,768.00 <br />5 <br />HMA Surface, 9.5 mm <br />499 <br />TON <br />126.00 <br />$62,874.00 <br />6 <br />HMA Intermediate, 12.5mm <br />35 <br />TON <br />130.00 <br />$4,550.00 <br />7 <br />Joint Adhesive <br />2240 <br />LFT <br />0.10 <br />$224.00 <br />8 <br />Concrete Curb, Installation <br />200 <br />LFT <br />128.00 <br />$25,600.00 <br />9 <br />Structure, Dry Well, 1800 Gal. <br />2 <br />EA <br />11,900.00 <br />$23,800.00 <br />10 <br />Pipe, Circular, 24 in., Perforated <br />97 <br />LFT <br />238.00 <br />$23,086.00 <br />BASE QUOTE TOTAL <br />$190,000.00 <br />Alternate No. 1 <br />Line Item <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />1 i <br />Milling, 1.5" <br />1450 <br />SYS <br />5.40 <br />$7,830.00 <br />2 <br />HMA Surface, 9.5 mm <br />126 <br />TON <br />128.00 <br />$16,128.00 <br />3 <br />Joint Adhesive <br />840 <br />LFT <br />0.10 <br />$84.00 <br />ALTERNATE NO. 1 TOTAL <br />$24,042.00 <br />Version 03/15/2023 Page - 24 Public Works Quote <br />