My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Pure Green Farms Site Improvements Proj No. 121-056 - C&E Excavating, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Bids
>
Opening of Bids - Pure Green Farms Site Improvements Proj No. 121-056 - C&E Excavating, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 9:15:09 AM
Creation date
7/11/2023 1:37:08 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
7/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 4.1 of ANSI Z358.1 specifies that emergency shower heads shall be capable of delivering a <br />minimum of 20 gallons per minute (gpm) of flushing fluid at a velocity low enough to be non -injurious to the <br />user. A sufficient volume of flushing fluid shall be available to supply the flow rate for a minimum fifteen <br />minute period. As such, both temporary and permanently installed eye / body wash stations must provide at <br />least 20 gpm for 15 mins. <br />Inspection and maintenance of eye wash systems should be provided at least weekly by assuring sanitary <br />conditions and /or following the manufacturer's requirements for maintenance. Plumbed systems should <br />also be provided a water flow test to minimize contaminants in the line. Inspection and maintenance should be <br />properly documented. <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.