My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to OEA - WM Replacmnt. Greenlawn & S. 30th Proj No. 122-041 - A&Z Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to OEA - WM Replacmnt. Greenlawn & S. 30th Proj No. 122-041 - A&Z Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2023 1:51:54 PM
Creation date
6/27/2023 1:51:51 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/27/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 1 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />This is EXHIBIT K, consisting of pages, referred to <br />in and part of the Agreement between Owner and <br />Engineer for Professional Services dated , . <br /> <br />AMENDMENT TO OWNER-ENGINEER AGREEMENT <br />Amendment No. ___1__ <br /> <br />1. Background Data: <br /> <br />a. <br /> <br />Effective Date of Owner-Engineer Agreement: <br /> <br />June 14, 2022 <br /> <br />b. <br /> <br />Owner: <br /> <br />Board of Public Works, City of South Bend, IN <br /> <br />c. <br /> <br />Engineer: <br /> <br />A&Z Engineering, LLC <br /> <br />d. <br /> <br />Project: <br /> <br />Grand Trunk Watermain Replacements at Greenlawn Avenue and S. 30th <br />Street Crossings <br /> <br />2. Description of Modifications: Modifications reflecting G&T Western Railroad First review <br />requirements a) Undertake Geotechnical Investigations and Reports to comply with Grand <br />Trunk Railroads Permit Requirements. b) Undertake Detailed Work Plan c) Settlement <br />Monitoring Plan d) Construction Monitoring <br /> <br />EXHIBIT A The Scope of Services currently authorized to be performed by Engineer in <br />accordance with the Agreement and previous amendments, if any, is modified as <br />follows: <br /> <br /> <br />PART 1 – BASIC SERVICES <br /> <br />A1.04 Grand Road Railroad coordination <br /> <br /> A Engineer shall, <br /> <br />Revise the following, <br /> <br />5. Work Plans, Settlement Monitoring Plan. NOT INCLUDED <br />TO <br /> <br />5. Undertake Settlement Monitoring Plans and Field Services before <br />and during construction. Work Plans undertaken by Contractor. <br />6. Undertake Construction Monitoring Services by Professional <br />Engineer
The URL can be used to link to this page
Your browser does not support the video tag.