Laserfiche WebLink
N W MCC was the general contractor on a <br />rehabilitation contract. NWMCC installed <br />Snderson & Denzler Assoc <br />approximately 6 liners and 253 MtM of 8" <br />3 Complete <br />— <br />Butler <br />NJ <br />Butler Township <br />Bill Ryden <br />Liner <br />6 <br />2015 <br />253.00 <br />Cranford <br />NJ <br />City of Cranford <br />Sandra <br />Installed 72' <br />2015 <br />72.00 <br />3_Complete <br />CME Associates: Joseph Gemmell, P.E. <br />3141 Bordentown Ave Prlin, NJ <br />Installation of 10 CIPP Point Repairs <br />3_Complete <br />Franklin Township <br />NJ <br />Franklin Township <br />732-727-8000 <br />Installation of 1,300 LF of MTM <br />10 <br />2015 <br />1,300.00 <br />Maser Consulting <br />Sanitary sewer repairs and re -lining of <br />Green Brook <br />NJ <br />Township of Green Brook <br />Ronald Madison: 610-868-4201 <br />various 8" sanitary sewer mains. <br />10 <br />2015 <br />993.00 <br />3 Complete <br />— <br />Montana Construction: Mike <br />80 Content Ave, Lodi, NJ 07644 <br />3_Complete <br />Paterson <br />NJ <br />City of Paterson <br />(973) 478-5200 <br />Installation of 215LF of MTM <br />2015 <br />1,003.00 <br />South Orange <br />NJ <br />South Orange <br />MTM Lining <br />2015 <br />300.00 <br />3_Complete <br />Reivax Contracting <br />Installed 7 Sectional CIPP Repairs and <br />Union <br />NJ <br />Township of Union <br />Luis Santana: 973-817-5553 <br />1,402 of full segment liners <br />7 <br />2015 <br />1,575.00 <br />3_Complete <br />Installation of 13,500 LF of 8" to 10" MH to <br />Roslyn <br />NY <br />Village of Roslyn <br />Sam Dalipinski: 516-204-3469 <br />MH Sanitary Sewer lining <br />2015 <br />26,130.00 <br />3_Complete <br />Suffolk County Town of <br />Suffolk County <br />NY <br />Suffolk Couny <br />Ralph Sergio 631-854-4901 <br />MTM Lining <br />2015 <br />813.00 <br />3_Complete <br />Suffolk County Town of <br />Suffolk County <br />NY <br />Suffolk Couny <br />Ralph Sergio 631-854-4902 <br />Installed 4 CIPP Repairs <br />4 <br />2015 <br />3_Complete <br />Lanc & Tully: Dawn Kalisky <br />P.O. Box 687 Rt 207 <br />Goshen, NY 10924 <br />3_Complete <br />Goshen <br />NY <br />Village of Goshen <br />845.294.3700 <br />Installed 24 CIPPs & 750Lf of MtM Lining <br />24 <br />2015 <br />750.00 <br />Sub Contractor to Video Pipe Services Greg <br />Green Castle <br />PA <br />Greencastle Township Pa <br />Stevenson - 856-697-1900 <br />MTM Lining Various areas 8" - 12" <br />2015 <br />1,649.00 <br />3 Complete <br />— <br />Jason Gruber <br />Manager Distribution & Collections <br />Lehigh County Authority <br />1242 Martin Luther King Jr Dr. <br />3_Complete <br />Allentown, Pennsylvania 18102 <br />JasonGruber@lehighcountyauthority.org <br />Lehigh County <br />PA <br />Lehigh County Authority <br />610-437-7646, ext. 753 <br />MTM Lining <br />2015 <br />2,155.00 <br />SSM Group <br />Installation of 61 spot repairs in 8" to 24" <br />Norristown <br />PA <br />City of Norristown <br />Jim Carr: 610-621-2000 <br />line totaling over 450 linear feet <br />8" <br />2015 <br />450.00 <br />3_Complete <br />Maser Consulting: Paul S. Niehoff, P.E. <br />Montvale <br />NJ <br />Town of Montvale <br />973-398-3110 <br />Installation of 825LF <br />2014 <br />825.00 <br />3 Complete <br />— <br />Alaimo Group Consulting Engineers <br />Nordam Murphy, P.E.: 973-523-6200 <br />MH to MH- 510 FT 15" <br />3_Complete <br />Totowa <br />NJ <br />Township of Totowa <br />Fax: 973-523-1765 <br />175 FT 8" <br />2014 <br />685.00 <br />Installation of 3,180 LF of MH to MH Lining <br />Gannett Fleming Engineering <br />in 8" - 10" Sanitary Sewer Mains. Installed <br />3_Complete <br />Northport <br />NY <br />Village of Northport <br />Nathan Wheeler: 516-364-4140 x1322 <br />15 - 6 ft Sectional CIPP Repairs <br />10" <br />2014 <br />3,180.00 <br />H2M Engineering <br />Oyster Bay <br />NY <br />Oyster Bay Sewer Authority <br />Steve Head: 631-756-8000 Ext: 1510 <br />Installed 28 CIPPs and 170FT Main Lining <br />8" <br />2014 <br />170.00 <br />3_Complete <br />Installation of 1900 LF of 8" sewer main <br />Ralph Sergio: 631-854-4901 <br />and 450 LF of 12" sewer main. Installation <br />3_Complete <br />Port Jefferson <br />NY <br />Town of Port Jefferson <br />Email: ralph.sergio@suffolkcountyny.gov <br />of 2 - Eft Sectional CIPPs <br />8" <br />2014 <br />2,350.00 <br />Point repairs- 15 / 5FT Repairs <br />3/ 6 FT Repairs <br />1/ 8 FT Repair <br />200 FT additional lining <br />3_Complete <br />Robert P. Naegele, P.E: 570-586-5091 <br />MH TO MH - 256 FT 8" <br />Clark Summit <br />PA <br />Borough of Clark Summit <br />Fax: 570-586-5073 <br />135 FT 10" <br />8" <br />2014 <br />391.00 <br />Dover <br />NJ <br />Dover Board of Education <br />Jonathan R. Tardi f P.E, C.M.E., Engineer <br />Installed 450 ft 8" CIPP Sewer Main <br />2013 <br />450.00 <br />3_Complete <br />Rome Management Associates <br />Installed 7,400' linear feet of 8" and 12" <br />Fort Dix <br />NJ <br />Fort Dix <br />Judy Brooks: 609-393-7600 <br />liner <br />2013 <br />7,400.00 <br />3_Complete <br />Hatch Mott MacDonald <br />Installation of 1200LF of MH to MH Lining <br />Hanover Sewerage <br />Robert Haller: 973-912-2538 <br />8" Main. Installation of 2 - Eft Sectional <br />3_Complete <br />Hanover <br />NJ <br />Authority <br />Fax: 973-912-2455 <br />CIPPs <br />2 <br />2013 <br />1,200.00 <br />Hasbrouck Heights <br />Borough of Hasbrouck <br />NJ <br />Heights <br />Job & Job Engineering: 201-487-8754 <br />Installed 750' of 8 inch CIP Sewer Main <br />2013 <br />750.00 <br />3_Complete <br />Bronxville <br />NY <br />Yonkers, NY <br />Mike May: 914-337-1312 <br />Installed 1,000' of 8" liner <br />8" <br />2013 <br />1,000.00 <br />3_Complete <br />May Brook <br />DeWinter Engineering <br />Installation of 2200' of 8" & 10" CIP Sewer <br />NY <br />May Brook Township <br />Jim DeWinter: 845-888-2722 <br />Main <br />8" <br />2013 <br />2,200.00 <br />3_Complete <br />BDG Construction Corp <br />Syosset <br />NY <br />Town of Oyster Bay <br />Anthony Galu: 516-624-1979 <br />Installed 150' 8 inch CIP Pipe <br />8" <br />2013 <br />150.00 <br />3_Complete <br />