My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1. 655 River Avenue_COA 2023-0516A
sbend
>
Public
>
Historic Preservation
>
2023
>
June
>
1. 655 River Avenue_COA 2023-0516A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 5:05:17 PM
Creation date
6/14/2023 3:48:34 PM
Metadata
Fields
Template:
South Bend HPC
HPC Document Type
Certification
HPC Local Historic District
ii. Edgewater Drive
Text box
ID:
1
Creator:
Created:
6/14/2023 3:48 PM
Modified:
6/14/2023 3:48 PM
Text:
mailto:atoering@southbendin.gov
ID:
2
Creator:
Created:
6/14/2023 3:48 PM
Modified:
6/14/2023 3:48 PM
Text:
mailto:atoering@southbendin.gov
ID:
3
Creator:
Created:
6/14/2023 3:48 PM
Modified:
6/14/2023 3:48 PM
Text:
mailto:doris.e.walterhouse@gmail.com
ID:
4
Creator:
Created:
6/14/2023 3:48 PM
Modified:
6/14/2023 3:48 PM
Text:
mailto:caleb.stinson@gmail.com
ID:
5
Creator:
Created:
6/14/2023 3:48 PM
Modified:
6/14/2023 3:48 PM
Text:
mailto:atoering@southbendin.gov
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-Siding replacement in other areas <br />-Upper and lower molding around house (shaping to match old) <br />-Mini-split heat pump (mini-split heads inside) <br />-N / S and Dormer windows reglazed and hung <br />-Reuse sunroom window for kitchen / sunroom <br />-Stairs <br />-Powder bath framed in <br />-Old plumbing removed <br />-Old electric and box taken out <br />-Electric Rough in - complete <br />-Plumbing rough in - complete <br />-Deep clean of studs <br />-Reframing / support framing for most ceiling/floors and roofs <br />-Cellar - completely new entrance, new doors <br />-Cellar - new floor and sump pit <br />- Masonry repairs around foundation <br />-Bathroom and pantry floors replaced <br />-Restoring interior doors <br />On Tue, May 30, 2023 at 3:42 PM Adam Toering <atoering@southbendin.gov> wrote: <br />Also -- the Building Department shouldn’t need anything from HPC for <br />interior/plumbing/electrical work. If they give you any grief when trying to get those <br />permits, let me know, and I’ll either A) talk to them, or B) create a generic approval for your <br />overall project that should keep them happy. <br /> <br />Adam Toering <br />Historic Preservation Administrator <br />Department of Community Investment <br />(574) 235-7478 <br />atoering@southbendin.gov <br />City of South Bend <br />227 W. Jefferson Blvd., Ste. 1400S <br />South Bend, IN 46601 <br /> <br />From: Dori Walterhouse <doris.e.walterhouse@gmail.com> <br />Sent: Tuesday, May 16, 2023 7:41 AM <br />To: Caleb Stinson <caleb.stinson@gmail.com>; Adam Toering <br /><atoering@southbendin.gov> <br />Subject: COA Application <br /> <br />Hi, Adam - <br />We realized that our general construction permit expiration date got away from us (expires
The URL can be used to link to this page
Your browser does not support the video tag.