Laserfiche WebLink
<br /> <br />Page 2 <br />(Exhibit D - Resident Project Representative) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />COMMONWEALTH ENGINEERS, INC. <br />STANDARD HOURLY RATES AND REIMBURSABLE EXPENSES SCHEDULE <br />July 1, 2022 – June 30, 2023 <br />Billing Class Rate Per Hour Billing Class Rate Per Hour <br />Principal III $ 112.20 Environmental Compliance Manager $ 55.29 <br />Principal II $ 102.94 Compliance Specialist $ 30.94 <br />Principal I $ 94.10 Environmental Scientist $ 30.94 <br /> <br />Project Manager IV $ 93.13 Construction Manager $ 57.70 <br />Project Manager III $ 87.13 <br />Project Manager II $ 71.06 Resident Project Representative IV $ 45.99 <br />Project Manager I $ 63.97 Resident Project Representative III $ 38.83 <br /> Resident Project Representative II $ 35.04 <br />Senior Electrical Engineer $ 87.13 Resident Project Representative I $ 31.25 <br /> <br />Senior Process Engineer $ 76.46 Clerical III $ 37.88 <br /> Clerical II $ 29.22 <br />Project Engineer IV $ 72.35 Clerical I $ 21.43 <br />Project Engineer III $ 57.98 <br />Project Engineer II $ 54.64 Reproduction Processor $ 26.79 <br />Project Engineer I $ 50.67 <br /> Trainee $ 20.82 <br />Engineering Intern III $ 45.04 <br />Engineering Intern II $ 42.36 CADD Specialist IV $ 44.07 <br />Engineering Intern I $ 38.20 CADD Specialist III $ 40.03 <br /> CADD Specialist II $ 34.23 <br /> CADD Specialist I $ 27.41 <br />Designer IV $ 55.39 <br />Designer III $ 50.83 Chief Technology Officer $ 63.38 <br />Designer II $ 46.34 IT Tech $ 30.59 <br />Designer I $ 37.40 Multimedia Coordinator $ 50.40 <br /> <br /> Survey Manager $ 60.00 <br />Operations Specialist $ 45.30 Surveyor $ 47.25 <br /> Project Surveyor $ 42.10 <br />Grants Manager $ 57.67 Field Technician $ 36.12 <br /> <br />In order to arrive at the total billing rate, the above direct payroll rates shall be multiplied by factors of 44.3119% <br />and 96.4286% to account for payroll and general overhead costs respectively. In addition, a 15% profit level is then <br />added to arrive at total labor costs. This is a total multiplier factor of 3.2599 times direct payroll rates. <br /> <br /> <br />