My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - CSO 22 Control Valve Replacement Proj No. 123-032 – Commonwealth Engineers, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - CSO 22 Control Valve Replacement Proj No. 123-032 – Commonwealth Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 2:05:00 PM
Creation date
6/13/2023 2:04:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
6/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Page 5 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />2. Resident Project Representative (RPR): DELETED <br />3. Selecting Independent Testing Laboratory: Assist Owner in the selection of an <br />independent testing laboratory to perform the services identified in Exhibit B, Paragraph <br />B2.01.0. <br />4. Pre-Construction Conference: Participate in a Pre-Construction Conference prior to <br />commencement of Work at the Site. <br />5. Schedules: Receive, review, and determine the acceptability of any and all schedules that <br />Contractor is required to submit to Engineer, including the Progress Schedule, Schedule of <br />Submittals, and Schedule of Values. <br />6. Baselines and Benchmarks: As appropriate, establish baselines and benchmarks for <br />locating the Work which in Engineer’s judgment are necessary to enable Contractor to <br />proceed. <br />7. Visits to Site and Observation of Construction: In connection with observations of <br />Contractor’s Work while it is in progress: <br />a. Make visits to the Site at intervals appropriate to the various stages of construction, as <br />Engineer deems necessary, to observe as an experienced and qualified design <br />professional the progress of Contractor’s executed Work. Such visits and observations <br />by Engineer, and the Resident Project Representative, if any, are not intended to be <br />exhaustive or to extend to every aspect of Contractor’s Work in progress or to involve <br />detailed inspections of Contractor’s Work in progress beyond the responsibilities <br />specifically assigned to Engineer in this Agreement and the Contract Documents, but <br />rather are to be limited to spot checking, selective sampling, and similar methods of <br />general observation of the Work based on Engineer’s exercise of professional <br />judgment, as assisted by the Resident Project Representative, if any. Based on <br />information obtained during such visits and observations, Engineer will determine in <br />general if the Work is proceeding in accordance with the Contract Documents, and <br />Engineer shall keep Owner informed of the progress of the Work. <br />b. The purpose of Engineer’s visits to, and representation by the Resident Project <br />Representative, if any, at the Site, will be to enable Engineer to better carry out the <br />duties and responsibilities assigned to and undertaken by Engineer during the <br />Construction Phase, and, in addition, by the exercise of Engineer’s efforts as an <br />experienced and qualified design professional, to provide for Owner a greater degree of <br />confidence that the completed Work will conform in general to the Contract <br />Documents and that Contractor has implemented and maintained the integrity of the <br />design concept of the completed Project as a functioning whole as indicated in the <br />Contract Documents. Engineer shall not, during such visits or as a result of such <br />observations of Contractor’s Work in progress, supervise, direct, or have control over <br />Contractor’s Work, nor shall Engineer have authority over or responsibility for the <br />means, methods, techniques, sequences, or procedures of construction selected or used <br />by Contractor, for security or safety at the Site, for safety precautions and programs <br />incident to Contractor’s Work, nor for any failure of Contractor to comply with Laws
The URL can be used to link to this page
Your browser does not support the video tag.