My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Century Center Skyway Restroom Upgrade Proj No. 123-042 - Larson-Danielson Cons.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes - Century Center Skyway Restroom Upgrade Proj No. 123-042 - Larson-Danielson Cons.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 1:57:56 PM
Creation date
6/13/2023 1:57:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 03/15/2023 Page - 5 Public Works Quote <br />XV. OTHER UTILITIES <br /> <br />A. Prevailing Specifications: None <br />B. Additions: <br /> <br />1. The Contractor shall be responsible for working with the other utilities, i.e., gas electric, telephone, <br />etc. in order to assure that all utilities that need to be replaced or relocated can be done with a <br />minimum disturbance to service. The Contractor shall also be responsible for coordinating <br />schedules with the various utilities such that they can proceed with their relocation work as <br />efficiently as possible. <br />2. If the odor of natural gas is detected in a work area at any time during the course of work, the <br />Contractor shall immediately notify NIPSCO at 1-800-634-3524. The Contractor shall also <br />immediately notify the residents of adjacent properties. The Contractor shall advise the residents <br />to evacuate their homes immediately if the odor is present within the dwelling. <br />3. Restoration of sprinkler systems damaged by the Contractor's operations shall be repaired by the <br />Contractor at no additional cost to the City or the Owner of the system. <br /> <br /> <br />XVI. DESCRIPTION OF WORK <br /> <br />A. Prevailing Specifications: American Structurepoint Contract Documents <br />B. Additions <br />1. Work to be performed shall include furnishing all labor, services, materials, insurance and <br />equipment to Complete Work for the City of South Bend. <br />2. The Base Bid covers Selective Demolition and Renovation of the Restrooms on the Second Floor <br />of the Century Center. <br />3. The Contractor shall preserve and protect all surrounding property, structures, tenants, visitors and <br />their property from damage caused by the Contractor’s operations. <br /> <br />XVII. PLANS <br /> <br />A. Prevailing Specifications: American Structurepoint Contract Documents <br />B. Additions: <br /> <br />1. The plans consist of 7 Sheets. <br />2. The work shall conform to the plans. <br />3. The drawings are schematic in nature. <br />4. The CONTRACTOR is responsible for estimating dimensions and quantities of materials. <br />5. In the event that the Special Provisions and the Plans conflict, the Special Provisions shall govern. <br /> <br /> <br /> <br />IV. M/WBE GOALS <br />A. Prevailing Specifications: City of South Bend Ordinance No. 10761-21, Minority and Women <br />Business Enterprise Inclusion Program Plan <br /> <br />B. Additions: <br />. <br />1. The M/WBE Goals for this Project are <br />a. MBE ___0.5__ %. <br />b. WBE __1.5__ % <br /> <br /> <br />2. Complete FORMS MBE-1.0 MBE Utilization Plan and WBE-1.0 WBE Utilization Plan, and submit <br />with Bid Proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.