My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Century Center Skyway Restroom Upgrade Proj No. 123-042 - Larson-Danielson Cons.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes - Century Center Skyway Restroom Upgrade Proj No. 123-042 - Larson-Danielson Cons.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 1:57:56 PM
Creation date
6/13/2023 1:57:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
6/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 03/15/2023 Page - 2 Public Works Quote <br /> <br /> <br />VI. INSURANCE <br /> <br />A. Prevailing Specifications: American Structurepoint Contract Documents. <br />B. Additions: <br /> <br />1. All Contractors and subcontractors doing business with the City of South Bend shall present a <br />Certificate of Insurance showing coverage in the following minimum amount: <br /> <br />a. General Liability: Premises-Completed Operations or Products, Bodily Injury and Property <br />Damage Combined Single Limit - $5,000,000. <br />b. There shall be no exclusion for explosion, collapse or underground hazard. <br />c. Workmen’s Compensation: Statutory State of Indiana Employer's Liability - $100,000. <br />d. Auto Liability: Bodily Injury and Property Damage Combined Single limit - $1,000,000. <br />e. The City of South Bend shall be named as additional insured on the Certificate of Insurance. <br /> <br />VII. CONTROL OF WORK <br /> <br />A. Prevailing Specifications: American Structurepoint Contract Documents. <br />B. Additions: <br /> <br />1. The complete responsibility for this project lies with the Director of Public Works of the City of South <br />Bend, Indiana acting through his authorized representatives. <br />2. Construction Engineering - The Contractor shall provide all the necessary, qualified personnel, <br />equipment and supplies to perform all work required under this item. There will be no direct payment <br />for this item. <br />3. The contractor is responsible to maintain the site which includes but is not limited to; dust control, <br />site security, erosion control, and protecting adjacent properties. <br />4. Work hours for the Project shall be from 7:00 a.m. through 6:00 p.m., Monday through Friday. No <br />work shall be permitted on weekends, Holidays, or after hours unless approved by the City of South <br />Bend Department of Public Works. <br /> <br />VIII. LEGAL RELATIONS <br /> <br />A. Prevailing Specifications: American Structurepoint Contract Documents. <br />B. Additions: <br />1. The Owner, where mentioned in these documents, is the City of South Bend. The Architect where <br />mentioned in these documents, is American Structurepoint, Inc. <br />2. The Contractor shall apply for and obtain any and all required permits for the work from local, state, <br />and federal agencies and shall comply with permit requirements, including the St. Joseph County <br />/ City of South Bend Building Department. <br />3. If the Contractor awarded this contract is not a resident of Indiana, within thirty days, the Contractor <br />shall provide the Owner with proof that the Contractor is duly licensed, qualified and registered with <br />the Secretary of State of Indiana to engage in business within the State of Indiana. <br />4. The Contractor shall comply with all provisions of Indiana Code 5-16-13, as amended. The Owner <br />reserves the right to immediately terminate the public work project awarded should the Contractor <br />be found to be in violation of any provision of Indiana Code 5-16-13 and such violation shall result <br />in the forfeiture of Contractor’s performance bond to the Owner. <br /> <br />IX. PROSECUTION AND PROGRESS <br /> <br />A. Prevailing Specifications: American Structurepoint Contract Documents. <br />B. Additions: <br /> <br />1. The project will have a construction schedule of ninety (90) calendar days for all work. The contract <br />time will start when the Notice to Proceed is delivered and signed. <br />2. The City, Architect, and Contractor will hold a pre-construction meeting following award of the <br />contract. The date of the Notice to Proceed will be agreed at that meeting.
The URL can be used to link to this page
Your browser does not support the video tag.