j J '4 j l
<br />BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />riE
<br />;
<br />}, ... ,-... r- I
<br />Project Name:
<br />Angela Boulevard Roadway Improvements
<br />Project Number:
<br />122-059
<br />For Bids Due:
<br />June 13, 2023
<br />Contractor Name:
<br />Rieth-Riley
<br />Division 2 (East)
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1
<br />CONSTRUCTION ENGINEERING (2%)
<br />1
<br />LS
<br />$15,000.00
<br />$15,000.00
<br />2
<br />MOBILIZATION AND DEMOBILIZATION
<br />(5%)
<br />1
<br />LS
<br />$108,829.14
<br />$108,829.14
<br />3
<br />CLEARING RIGHT OF WAY (3%)
<br />1
<br />LS
<br />$30,000.00
<br />$30,000.00
<br />4
<br />SIDEWALK, CONCRETE, REMOVE
<br />600
<br />SYS
<br />$86.10
<br />$51,660.00
<br />5
<br />EXCAVATION, COMMON
<br />2199
<br />CYS
<br />$118.87
<br />$261,395.13
<br />6
<br />MILLING, ASPHALT, 1.5 IN.
<br />21800
<br />SYS
<br />$2.61
<br />$56,898.00
<br />7
<br />HMA, SURFACE, TYPE B
<br />1821
<br />TON
<br />$151.48
<br />$275,845.08
<br />8
<br />HMA, INTERMEDIATE, TYPE B
<br />35
<br />TON
<br />$394.44
<br />$13,805.40
<br />9
<br />HMA, BASE, TYPE B
<br />97
<br />TON
<br />$230.21
<br />$22,330.37
<br />10
<br />HMA INTERMEDIATE OG, TYPE B
<br />38
<br />TON
<br />$371.22
<br />$14,106.36
<br />11
<br />CURB RAMP, CONCRETE
<br />393
<br />SYS
<br />$336.52
<br />$132,252.36
<br />12
<br />DETECTABLE WARNING SURFACES
<br />55
<br />SYS
<br />$191.57
<br />$10,536.35
<br />13
<br />SIDEWALK, CONCRETE, 4 IN.
<br />104
<br />SYS
<br />$84.48
<br />$8,785.92
<br />14
<br />SIDEWALK, CONCRETE, 6IN.
<br />597
<br />SYS
<br />$89.20
<br />$53,252.40
<br />15
<br />CURB, REMOVE
<br />2074
<br />LFT
<br />$20.38
<br />$421268.12
<br />16
<br />CURB, CONCRETE
<br />446
<br />LFT
<br />$72.30
<br />$32,245.80
<br />17
<br />CURB AND GUTTER, CONCRETE
<br />1628
<br />LFT
<br />$75.90
<br />$123,565.20
<br />18
<br />SODDING, NURSERY
<br />1939
<br />SYS
<br />$44.46
<br />$86,207.94
<br />19
<br />ADJUST VAULT LID TO GRADE
<br />1
<br />EACH
<br />$14,918.11
<br />$14,918.11
<br />20
<br />CASTING, 4, FURNISH AND ADJUST
<br />TO GRADE
<br />12
<br />EACH
<br />$1,335.75
<br />$16,029.00
<br />21
<br />CASTING, ADJUST TO GRADE
<br />23
<br />EACH
<br />$896.69
<br />$20,623.87
<br />22
<br />INLET, B15
<br />5
<br />EACH
<br />$7,923.37
<br />$39,616.85
<br />23
<br />INLET, C15
<br />8
<br />EACH
<br />$9,477.58
<br />$75,820.64
<br />24
<br />MAINTAINING TRAFFIC
<br />1
<br />LS
<br />$30,493.80
<br />$30,493.80
<br />25
<br />SIGN GROUND MOUNTED RESET
<br />20
<br />EACH
<br />$100.41
<br />$2,008.20
<br />26
<br />SIGN, SHEET, WITH LEGEND, 0.080 IN.
<br />66
<br />SFT
<br />$14.06
<br />$927.96
<br />27
<br />SIGN POST, SQUARE, TYPE 1,
<br />REINFORCED ANCHOR BASE
<br />210
<br />LFT
<br />$15.06
<br />$3,162.60
<br />28
<br />TRAFFIC SIGNAL EQUIPMENT,
<br />REMOVE
<br />3
<br />EACH
<br />$7,028.95
<br />$21,086.85
<br />Version 09/29/2021 Contractor's Bid for Public Works - 9
<br />
|