BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name:
<br />Angela Boulevard Roadway Improvements€�
<br />I --=
<br />Project Number:
<br />122-059
<br />For Bids Due:
<br />June 13, 2023
<br />Contractor Name:
<br />Rieth-Riley
<br />Division 2 (East)
<br />TRANSVERSE MARKING,
<br />$4.37
<br />$1, 000.73
<br />54
<br />THERMOPLASTIC, PARKING LINE,
<br />229
<br />LFT
<br />BLUE 4 IN.
<br />55
<br />LINE, THERMOPLASTIC, SOLID,
<br />6889
<br />LFT
<br />$1.05
<br />$7, 233.45
<br />WHITE, 6 IN.
<br />TRANSVERSE MARKING,
<br />$6.25
<br />$7,062.50
<br />56
<br />THERMOPLASTIC, CROSSHATCH
<br />1130
<br />LFT
<br />LINE, WHITE, 121N.
<br />TRANSVERSE MARKING,
<br />$13.20
<br />$22,704.00
<br />57
<br />THERMOPLASTIC, CROSSWALK
<br />1720
<br />LFT
<br />LINE, WHITE, 24 IN.
<br />TRANSVERSE MARKING,
<br />$13.20
<br />$3, 445.20
<br />58
<br />THERMOPLASTIC, STOP LINE, WHITE,
<br />261
<br />LFT
<br />24 IN.
<br />59
<br />GROOVING FOR CENTERLINE
<br />1752
<br />LFT
<br />$0.68
<br />$1,191.36
<br />PAVEMENT MARKINGS
<br />PAVEMENT MESSAGE MARKING,
<br />$188.78
<br />$5,097.06
<br />60
<br />THERMOPLASTIC LANE INDICATION
<br />27
<br />EACH
<br />ARROW
<br />61
<br />PLANT, DECIDUOUS TREE, B&B, 2"
<br />109
<br />EACH
<br />$552.27
<br />$60,197.43
<br />2.511
<br />62
<br />PLANT, DECIDUOUS SHRUB, B&B, 24"
<br />362
<br />EACH
<br />$80.33
<br />$29,079.46
<br />63
<br />PLANT, EVERGREEN SHRUB, B&B,
<br />307
<br />EACH
<br />$70.29
<br />$21,579.03
<br />15 817
<br />64
<br />PLANT, EVERGREEN SHRUB, NO. 3
<br />294
<br />EACH
<br />$65.27
<br />$19,189.38
<br />CONT.
<br />65
<br />PLANT, ORNAMENTAL GRASS, NO. 2
<br />1292
<br />EACH
<br />$24.10
<br />$311137.20
<br />CONT.
<br />66
<br />PLANT, PERENNIAL, NO. 1 CONT.
<br />1731
<br />EACH
<br />$20.08
<br />$34,758.48
<br />67
<br />BACKFILL MATERIAL
<br />1100
<br />CYS
<br />$128.54
<br />$141,394.00
<br />68
<br />MINERAL MULCH
<br />311
<br />CYS
<br />$190.79
<br />$59,335.69
<br />69
<br />WEED CONTROL BARRIER
<br />2000
<br />SYS
<br />$3.51
<br />$7,020.00
<br />70
<br />SHREDDED HARDWOOD BARK
<br />14
<br />CYS
<br />$102.42
<br />$1,433.88
<br />MULCH
<br />71
<br />BORROW
<br />198
<br />CYS
<br />$197.07
<br />$39, 019.86
<br />72
<br />TEMPORARY INLET PROTECTION
<br />73
<br />EACH
<br />$247.56
<br />$18,071.88
<br />73
<br />HMA PATCHING FULL DEPTH, TYPE B
<br />42
<br />TON
<br />$1,447.86
<br />$60,810.12
<br />74
<br />PIPE, TYPE 2, CIRCULAR, 12 IN.
<br />91
<br />LFT
<br />$175.67
<br />$15, 985.97
<br />75
<br />BRICK PAVERS
<br />62
<br />SYS
<br />$291.45
<br />$18,069.90
<br />76
<br />INSTALL SHEET SIGN
<br />3
<br />EACH
<br />$150.62
<br />$451.86
<br />77
<br />DELINEATOR
<br />6
<br />EACH
<br />$100.41
<br />$602.46
<br />Version 09/29/2021 Contractor's Bid for Public Works - 11
<br />
|