BID/PROPOSAL
<br />H
<br />CITY OF SOUTH BEND :
<br />VI _I 3p
<br />PROJECT NAME: Angela Boulevard Roadway Improvements
<br />x � _
<br />PROJECT NO. 122-059
<br />FOR BIDS DUE: June 13, 2023
<br />CONTRACTOR NAME: Milestone Contractors North, Inc.
<br />Addendum no. 3
<br />Division 2 (East)
<br />TRANSVERSE MARKING, THERMOPLASTIC,
<br />54 PARKING LINE, BLUE 4 IN.
<br />229
<br />LFT
<br />4.35
<br />$996.15
<br />55
<br />LINE, THERMOPLASTIC, SOLID, WHITE, 6 IN.
<br />6889
<br />LFT
<br />1.05
<br />$7,233.45
<br />56
<br />TRANSVERSE MARKING, THERMOPLASTIC,
<br />CROSSHATCH LINE, WHITE, 12 IN.
<br />1130
<br />LFT
<br />6.22
<br />$7,028.60
<br />57
<br />TRANSVERSE MARKING, THERMOPLASTIC,
<br />CROSSWALK LINE, WHITE, 24 IN.
<br />1720
<br />LFT
<br />13.15
<br />$22,618.00
<br />58
<br />TRANSVERSE MARKING, THERMOPLASTIC,
<br />STOP LINE, WHITE,
<br />24 IN.
<br />261
<br />LFT
<br />13.15
<br />$3,432.15
<br />59
<br />GROOVING FOR CENTERLINE PAVEMENT
<br />MARKINGS
<br />1752
<br />LFT
<br />0.68
<br />$1,191.36
<br />60
<br />PAVEMENT MESSAGE MARKING,
<br />THERMOPLASTIC LANE INDICATION ARROW
<br />27
<br />EACH
<br />188.00
<br />$5,076.00
<br />61
<br />PLANT, DECIDUOUS TREE, B&B, 2"- 2.5"
<br />109
<br />EACH
<br />550.00
<br />$59,950.00
<br />62
<br />PLANT, DECIDUOUS SHRUB, B&B, 24"
<br />362
<br />EACH
<br />80.00
<br />$28,960.00
<br />63
<br />PLANT, EVERGREEN SHRUB, B&B, 15"-18"
<br />307
<br />EACH
<br />70.00
<br />$21,490.00
<br />64
<br />PLANT, EVERGREEN SHRUB, NO. 3 CONT.
<br />294
<br />EACH
<br />65.00
<br />$19,110.00
<br />65
<br />PLANT, ORNAMENTAL GRASS, NO. 2 CONT.
<br />1292
<br />EACH
<br />24.00
<br />$31,008.00
<br />66
<br />PLANT, PERENNIAL, NO. 1 CONT
<br />1731
<br />EACH
<br />2O.00
<br />$34,620.00
<br />67
<br />BACKFILL MATERIAL
<br />1100
<br />CYS
<br />82.00
<br />$90,200.00
<br />68
<br />MINERAL MULCH
<br />311
<br />CYS
<br />190.00
<br />$59,090.00
<br />69
<br />WEED CONTROL BARRIER
<br />2000
<br />SYS
<br />3.50
<br />$7,000.00
<br />70
<br />SHREDDED HARDWOOD BARK MULCH
<br />14
<br />CYS
<br />102.00
<br />$1,428.00
<br />71
<br />BORROW
<br />198
<br />CYS
<br />90.00
<br />$17,820.00
<br />72
<br />TEMPORARY INLET PROTECTION
<br />73
<br />EACH
<br />185.00
<br />$13,505.00
<br />73
<br />HMA PATCHING FULL DEPTH, TYPE B
<br />42
<br />TON
<br />330.00
<br />$13,860.00
<br />74
<br />PIPE, TYPE 2, CIRCULAR, 12 IN.
<br />91
<br />LFT
<br />255.00
<br />$23,205.00
<br />75
<br />BRICK PAVERS
<br />62
<br />SYS
<br />636.00
<br />$39,432.00
<br />76
<br />INSTALL SHEET SIGN
<br />3
<br />EACH
<br />150.00
<br />$450.00
<br />77
<br />DELINEATOR
<br />6
<br />EACH
<br />320.00
<br />$1,920.00
<br />Version 09/29/2021 Contractor's Bid for Public Works - 11
<br />
|