BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />PROJECT NAME: Angela Boulevard Roadway Improvements
<br />PROJECT NO. 122-059
<br />FOR BIDS DUE: June 13, 2023
<br />CONTRACTOR NAME: Milestone Contractors North, Inc.
<br />Addendum no. 3
<br />Division 1 (West)
<br />27
<br />LINE, THERMOPLASTIC, SOLID, YELLOW, 4 IN.
<br />7438
<br />LFT
<br />0.74
<br />$5,504.12
<br />28
<br />LINE, THERMOPLASTIC, BROKEN, YELLOW, 4
<br />997
<br />LFT
<br />IN.
<br />0.84
<br />$837.48
<br />TRANSVERSE MARKING, THERMOPLASTIC,
<br />29
<br />CROSSWALK
<br />118
<br />LFT
<br />13.15
<br />$1,551.70
<br />LINE, WHITE, 24 IN. _
<br />TRANSVERSE MARKING,
<br />30
<br />THERMOPLASTIC, STOP LINE, WHITE, 24 IN.
<br />57
<br />LFT
<br />13.15
<br />$749.55
<br />31
<br />GROOVING FOR CENTERLINE PAVEMENT
<br />9130
<br />LFT
<br />MARKINGS
<br />0.68
<br />$6,208.40
<br />PAVEMENT MESSAGE MARKING,
<br />32
<br />THERMOPLASTIC LANE INDICATION
<br />24
<br />EACH
<br />188.00
<br />$4,512.00
<br />ARROW
<br />33
<br />PLANT, DECIDUOUS TREE, B&B, 2"- 2.5"
<br />42
<br />EACH
<br />570.00
<br />$23,940.00
<br />34
<br />SHREDDED HARDWOOD BARK MULCH
<br />16
<br />CYS
<br />102.00
<br />$1,632.00
<br />35
<br />BORROW
<br />69
<br />CYS
<br />96.00
<br />$6,624.00
<br />36
<br />TEMPORARYINLET PROTECTION
<br />16
<br />EACH
<br />185.00
<br />$2,960.00
<br />37
<br />FILTER SOCK
<br />1637
<br />LFT
<br />5.45
<br />$8,921.65
<br />38
<br />HMA PATCHING FULL DEPTH, TYPE B
<br />54
<br />TON
<br />315.00
<br />$17,010.00
<br />39
<br />CLEAN STORM STRUCTURES
<br />16
<br />EACH
<br />620.00
<br />$9,920.00
<br />40
<br />ADA CASTING, FURNISH AND INSTALL
<br />1
<br />EACH
<br />3,000.00
<br />$3,000.00
<br />41
<br />CONSTRUCTION SIGN, A
<br />19
<br />EACH
<br />2O1.00
<br />$3,819.00
<br />42
<br />CONSTRUCTION SIGN, B
<br />3
<br />EACH
<br />135.00
<br />$405.00
<br />43
<br />FLASHING ARROW SIGN
<br />I 45
<br />DAY
<br />15.00
<br />$675.00
<br />44
<br />TEMPORARY PAVEMENT MARKING, 41N.
<br />1000
<br />LFT
<br />0.36
<br />$360.00
<br />45
<br />SIGNAL MODIFICATION
<br />1
<br />LS
<br />15,100.00
<br />$15,100.00
<br />46
<br />SIGNAL DETECTOR HOUSING
<br />3
<br />EACH
<br />1,000.00
<br />$3,000.00
<br />47
<br />CONTRACT ALLOWANCE
<br />1
<br />LS
<br />25,000.00
<br />$25,000.00
<br />DIVISION 1 TOTAL
<br />Version 09/29/2021 Contractor's Bid for Public Works - 8
<br />$1,006,000.00
<br />
|