My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - 2022 Curb & Sidewalk, Round I (Division 3, 4, & 5) Proj No. 122-001 - Premium Concrete
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 1 - 2022 Curb & Sidewalk, Round I (Division 3, 4, & 5) Proj No. 122-001 - Premium Concrete
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2023 2:59:38 PM
Creation date
5/23/2023 2:59:35 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/23/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project No. 122-001 Curb and Sidewalk Round 1 (Divisions 3, 4, and 5) <br />Change Order 1 Supplemental Information <br />Attn Board of Public Works: <br />The change order for a decrease in the contract amount for Curb and Sidewalk Round 1 <br />(Divisions 3, 4, and 5) is due to changes in scope and unforeseen conditions during the project increasing <br />the amount of work completed by Premium Concrete. The bulk of the increase in this change order <br />comes from an addition of concrete curb at a location in Division 4 to assist with drainage at this location. <br />Also, additions to concrete sidewalk were made as failing sidewalk adjacent to the project boundaries at <br />several locations were added to the project during the pre-construction walkthrough. <br />Daniel Sexton <br />Project Engineer
The URL can be used to link to this page
Your browser does not support the video tag.