Change Order No 1 - 2022 Curb & Sidewalk, Round I (Division 1 & 2) Proj No. 122-001 - Milestone Contractors North
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 1 - 2022 Curb & Sidewalk, Round I (Division 1 & 2) Proj No. 122-001 - Milestone Contractors North
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2023 2:59:35 PM
Creation date
5/23/2023 2:59:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/23/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project No. 122-001 Curb and Sidewalk Round 1 (Divisions 1 and 2) <br />Change Order 1 Supplemental Information <br />Attn Board of Public Works: <br />The change order for a decrease in the contract amount for Curb and Sidewalk Round 1 <br />(Divisions 1 and 2) is due to changes in scope during the project decreasing the amount of work <br />completed by Milestone. These changes were made as curb and sidewalk at several locations included in <br />the project plans were in good condition when examined during the pre-construction walkthrough. In <br />Division 1, the line items with underruns are concrete sidewalk removal, concrete sidewalk installation, <br />concrete curb removal, concrete curb installation, and topsoil and seeding. In Division 2, the line items <br />with underruns are concrete curb removal, concrete curb installation, and topsoil and seeding. <br />Daniel Sexton <br />Project Engineer