My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Quote - SBFD Parking Lot Rehab Proj No. 123-049 - Rieth-Riley Construction Co., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Award Quotations & Proposals
>
Award Quote - SBFD Parking Lot Rehab Proj No. 123-049 - Rieth-Riley Construction Co., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2025 2:32:28 PM
Creation date
5/23/2023 2:58:47 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/23/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT NAME: SOUTH BEND FIRE DEPARMENT PARKING LOT REHAB <br />ADDENDUM NO. 1 <br />Date: May 3, 2023 <br />To: All Plan Holders <br />From: Theresa Heffner, Clerk of the Board of Public Works <br />The following revisions to the specifications are to become a part of the original <br />specifications as if included therein. Only these items are to be altered. The <br />remainder of the drawings and specifications are to remain in their entirety. <br />Acknowledge receipt of this addendum in the space provided on the Bid Form. <br />This addendum consists of the following changes: <br />SPECIFICATIONS <br />XX. HOT MIX ASPHALT SURFACE, 9.5 MM — TYPE B <br />• REPLACE XX.0 with: Prevailing specifications shall be 2022, INDOT <br />Standard Specifications Sections 401 and 402. <br />• REPLACE XX.D.9 with: The binder shall be PG 64-28P in the HMA <br />surface mix. The coarse aggregate in the mix shall only be limestone. The <br />HMA surface mix size shall be 9.5mm. <br />XXII. HOT MIX ASPHALT PATCH <br />• REPLACE XXII.B.9 with: Patching shall extend to a depth of size (6) <br />inches or to match the pre-existing surface, whichever is deeper. The patch <br />shall be filled with HMA Base 5D up to 1.5" below the surface of <br />surrounding pavement before seal coating. Compaction shall be applied <br />prior to applying any HMA surface material. 1.5" of HMA surface 9.5 <br />mm, Type B shall be applied up to the elevation of the surrounding <br />pavement. The seal coating in specification XXI shall be applied over <br />the patch. <br />You must acknowledge receipt of this addendum by signing the first page, <br />returning it via facsimile to (574) 235-9171, and a copy of the first page must be <br />included with your bid. <br />— This addendum consists of a total of 2 pages — <br />Version 4/2/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.