Laserfiche WebLink
Addendum No.1 <br />City of South Bend — Monroe Circle Demolition <br />ADDENDUM NO. 1 <br />OWNER: City of South Bend, Indiana, and Housing Authority of South Bend <br />ENGINEER: Abonmarche Consultants, Inc. <br />Roger T. Nawrot, P.E. <br />PROJECT: Monroe Circle Demolition <br />Project No. 123-048 <br />SUBJECT: Additional Project information and Requirement <br />TO: Plan Holders of Record <br />ISSUE DATE: May 19, 2023 <br />This Addendum No. 1 to the Plans and Specifications and Bidding shall supplement, amend, and become part <br />of these documents. All bids and construction contracts shall incorporate the items addressed in this <br />Addendum. A signed copy of this Addendum Cover Sheet shall be included with the submitted bid. <br />ADD to Table of Contents: <br />1. Conformation of Electrical Service Retirement - AEP (I&M Power) 4/5/23 1 Page <br />2. Conformation of Telephone Service Retirement - AT&T 2/28/23 1 Page <br />3. Conformation of Cable Service Retirement - Comcast 2/28/23 1 Page <br />4. Heartland Environmental Associates - Demolition Bid Specifications Addendum Potential <br />Asbestos Containing materials Abatement Monroe Circle Apartments 2 Pages. <br />All the above documents are attached to this Addendum. <br />Clarifications: <br />1. Question: Along the perimeter streets, are the sidewalks in the tree lawn between street <br />walk and curb to be removed? A note concerning going to the curb along Monroe. <br />Monroe Circle is a private street. Sidewalks are to be removed to the back of curb <br />for walks adjacent to and in the tree lawn of Monroe Circle. Sidewalks within Taylor <br />Street, Alonzo Watson Drive and W. South Street Right of ways shall remain <br />including sidewalks within the tree lawn. <br />Special Provisions: <br />1. Section X. CONTROL OF WORK - Add the following: <br />5. The Contractor shall allow an Independent Contractor who is hired by the Housing <br />Authority of South Bend on site and working room to removal the 2 Fuel Oil Storage tanks at <br />the north end of the site. The Independent Contractor will backfill and grade the removal <br />site. <br />Page 1 of 2 <br />