My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - 2023 Splashpad Renovations Southeast & Coquillard Parks – WBK Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - 2023 Splashpad Renovations Southeast & Coquillard Parks – WBK Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2023 2:24:32 PM
Creation date
5/9/2023 2:24:11 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
5/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 (Exhibit C – Compensation Decision Guide) EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. 1. Compensation for Basic Services (not including Resident Project Representative) (as described in Exhibit A, Part I) Decision Question: Which method of compensation is to be used? Lump Sum Standard Hourly Rates Percentage of Construction Costs Direct Labor Costs Times a Factor Direct Labor Costs Plus Overhead Plus a Fixed Fee Salary Costs Times a Factor Use This Base Compensation Packet Packet BC-1 Packet BC-2 Packet BC-3 Packet BC-4 Packet BC-5 Packet BC-6 Include This Appendix N/A Appendices 1 and 2 N/A Appendix 1 Appendix 1 Appendix 1 2. Compensation for Resident Project Representative (as described in Exhibit A, Paragraph A1.05.A.2, and in Exhibit D) Decision Question: Which method of compensation is to be used? Lump Sum Standard Hourly Rates Percentage of Construction Costs Direct Labor Costs Times a Factor Salary Costs Times a Factor Use This RPR Compensation Packet Packet RPR-1 Packet RPR-2 Packet RPR-3 Packet RPR-4 Packet RPR-5 Include This Appendix N/A Appendices 1 and 2 N/A Appendix 1 Appendix 1 COMPENSATION DECISION GUIDE FOR USE WITH EXHIBIT C TO EJCDC E-500, 2008 EDITION <br /> Compensation Decision Guide for Use with Exhibit C to EJCDC E-500, 2008 Edition <br /> Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.