My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - River Lights-Plaza Park Proj No. 122-047 - Acorn Landscaping LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 1 - River Lights-Plaza Park Proj No. 122-047 - Acorn Landscaping LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2023 2:21:31 PM
Creation date
5/9/2023 2:21:28 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project No. 122-047 Plaza Park Improvements: Final Change Order Accounting <br /> <br /> <br />Added costs & overruns: <br />1. Item 17- Steel Edging -overrun $498.80 <br />2. Remove mulch and soil and install #53 crushed concrete for (5) concrete benches $3155 <br />3. Place (5) concrete benches- Includes pick up, delivery, installation, and lawn restoration $5780 <br />4. Over-ex and removal of 60cys buried debris, bricks and concrete $1960 <br />5. Install 60 cys of screened topsoil $2889 <br />6. Design changes for PIP Surface- Additional color and widening of the stripes $1,160 <br />Total: $15,442.80 <br /> <br /> <br />Underruns: <br />1. Item 9- 1.5” PVC Conduit and Wiring ($773.50) <br />2. Item 5- 4” Concrete ($2,327.50) <br />Total: ($3,101) <br /> <br />Total change: +$12,341.80 <br />
The URL can be used to link to this page
Your browser does not support the video tag.