My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Coal Line Trail Phase IIA Proj No. 115-064 - INDOT Selge
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Change Orders
>
Change Order No 1 - Coal Line Trail Phase IIA Proj No. 115-064 - INDOT Selge
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2023 2:21:28 PM
Creation date
5/9/2023 2:21:25 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/9/2023
Text box
ID:
1
Creator:
Created:
5/9/2023 2:21 PM
Modified:
5/9/2023 2:21 PM
Text:
Selge Construction Co., Inc.
ID:
2
Creator:
Created:
5/9/2023 2:21 PM
Modified:
5/9/2023 2:21 PM
Text:
4/18/2023
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:R -38065 INDIANA Date:04/18/2023 <br />Change Order No:001 Department of Transportation Page: 3 <br />Contract:R -38065 <br />Project:1401811 - State:140181100LC4 <br />Change Order Nbr: 001 <br />Change Order Description: Concrete For Multiuse Path <br />Reason Code:SCOPE CHANGES, Added Quantities/Items <br />CLN PCN PLN Item Code Unit Unit Price CO Qty Comment Amount Change <br />0027 1401811 0027 604-05528 TON 157.000 -666.000 C Amount:$ -104,562.00 <br />Item Description:HMA FOR SIDEWALK <br />Supplemental Description1: <br />Supplemental Description2: <br />0087 1401811 0087 604-06070 SYS 48.150 2172.000 C Amount:$ 104,581.80 <br />Item Description:SIDEWALK CONCRETE <br />Supplemental Description1: Multi-Use Path Participting <br />Supplemental Description2: <br />0089 1401811 0088 604-06070 SYS 48.150 1528.000 C Amount:$ 73,573.20 <br />Item Description:SIDEWALK CONCRETE <br />Supplemental Description1: Multi-Use Path Non Participating <br />Supplemental Description2: <br />Total Value for Change Order 001 = $ 73,593.00 <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change is recommended. <br />General or Standard Change Order Explanation <br />The City of South Bend requested the multi-use path in the original bid be changed from HMA to five inch thick concrete sidewalk. The price <br />Selge submitted for the concrete is acceptable. The dollar amount bid for the HMA will be the participating dollar amount from the orignal bid and <br />the remainder will be non-particpating. 3700 syd was anticipated. The participating amount will be 2172 syd and the non-participating amount will <br />be 1528 syd. The PM has been notified. No time will be added to the contract for this change order. <br />Change Order Explanation for Specific Line Item <br />**************************************************************************************************************************** <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor:____________________________________________Signed By:_____________________________________________ <br />Date:__________________________________________________ <br />*************************************************************************************************************************** <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SiteManager system.
The URL can be used to link to this page
Your browser does not support the video tag.