My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Small Drainage Improvements-Beale Street & Chapin Street Proj No. 121-006B - Selge Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Bids
>
Opening of Bids - Small Drainage Improvements-Beale Street & Chapin Street Proj No. 121-006B - Selge Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 9:27:27 AM
Creation date
5/9/2023 2:14:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/9/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SLUSSERS <br />SPECIAL CONDITIONS <br />Concerning the Attached Quotation <br />Quote Number: 2021BIDB <br />STANDARD NOTATIONS; <br />1. Special note concerning seeding. Slussees will install seed year-round, However, we will not guarantee <br />seeding performed May 15th through August 15th, and October 1 through March 1. Seeding during this <br />period is very risky due to extreme climatic conditions {heat(drought/cold/etc,} This note does not apply <br />to prairie or wetland seeding unless specified otherwise. <br />2. This quote is valid for a period of 60 days. <br />3. Lawn maintenance to include mowing or spraying is not included in this quotation. <br />4. Topsoil, topsoil placement and any necessary amendments are not included in this quotation. <br />5. Quantities on this quotation are approximate. Areas will be measured and invoiced per unit prices. <br />6. Performance & Payment bonds are available but not included in this quotation. <br />7. Clearing, grubbing, removal of rocks, debris and existing vegetation is not included in this quotation <br />8. Seeding or sodding off right-of-way or outside of the construction limits is not included in this quotation. <br />9. Inorganic and Organic soil amendments are not included in this quotation. <br />10, Turf Sod partial price does not include topsoil, topsoil placement, ground preparation, or notching <br />11. Turf Sod partial price includes supplying and installing 100% Kentucky Bluegrass variety sod and watering <br />for 30 days per Indot specifications <br />12. Tree price includes supplying and installing 2.5" Caliper size tree, staking, hardwood mulch, and a 1 <br />year warranty. <br />13. Optional ground prep price for turf sod does not include topsoil, topsoil placement, grading, or removal <br />of existing vegetation. <br />14. Optional ground prep price for turf sod includes sod notching, fine raking, knocking down dirt clods, and <br />removal of rocks only. <br />15. Removal or transplanting existing landscape material is not included in this quotation. <br />16. Steel landscape edging is not included in this quotation. <br />17. Supplying or installing topsoil, planting soil, engineering soil, or subsoil is not included in this quotation. <br />18. Maintenance or warranty bond for turf sod or trees is not included in this quotation. <br />19. Sodding price does not include a 1 year warranty or a 1 year maintenance. <br />20. Indiana State Sales Tax has not been included in pricing. <br />21. Traffic control is the responsibility of the contra ctorlowner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.