Laserfiche WebLink
BIDIPROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: CITY OF SOUTH BEND 2021 DRAINGE IMPROVEMENTS — BID B <br />Project Number: 121-006B <br />For Bids Due: MAY 9, 2023 <br />Contractor Name: HRP Construction Inc. <br />DIVISION 2 — CHAPIN STREET IMPROVEMENTS <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />CONSTRUCTION ENGINEERING <br />1 <br />LSUM <br />5,000.00 <br />5,000.00 <br />2 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LSUM <br />15,000.00 <br />15,000.00 <br />3 <br />MAINTENANCE OF TRAFFIC <br />1 <br />LSUM <br />9,100.00 <br />9,100.00 <br />4 <br />VIDEO RECORD <br />1 <br />LSUM <br />1,500.00 <br />1,500.00 <br />5 <br />CLEARING OF RIGHT-OF-WAY (W/IN <br />PROJECT LIMITS) <br />1 <br />LSUM <br />25,950.00 <br />25,950.00 <br />6 <br />CONCRETE, PAVEMENT REMOVE <br />112 <br />SYS <br />10.00 <br />1,120.00 <br />7 <br />CONCRETE, CURB REMOVE <br />200 <br />LFT <br />6.00 <br />1,200.00 <br />8 <br />SURFACE MILLING, ASPHALT 1.5 IN <br />775 <br />SFT <br />5.50 <br />4,262.50 <br />9 <br />COMMON EXCAVATION, ASPHALT REMOVE <br />215 <br />SYS <br />30.00 <br />6,450.00 <br />10 <br />CLEAR AND GRUB <br />1240 <br />SFT <br />5.00 <br />6,200.00 <br />11 <br />TREE REMOVE <br />4 <br />EACH <br />1,650.00 <br />6,600.00 <br />12 <br />COMPACTED AGGREGATE, No. 53 <br />35 <br />CYS <br />65.00 <br />2,275.00 <br />13 <br />HMA SURFACE, TYPE B, 1.5" <br />25 <br />TON <br />439.00 <br />10,975.00 <br />14 <br />HMA INTERMEDIATE, TYPE B, 2.5" <br />30 <br />TON <br />345.00 <br />10,350.00 <br />15 <br />HMA BASE, TYPE 8, 4" <br />48 <br />TON <br />251.00 <br />12,048.00 <br />16 <br />SIDEWALK, CONCRETE, 4 IN <br />120 <br />SYS <br />96.00 <br />11,520.00 <br />17 <br />CONCRETE CURB <br />200 <br />LFT <br />55.00 <br />11,000.00 <br />18 <br />DRYWELLSTRUCTURE, 3600 GAL <br />1 <br />EACH <br />12,500.00 <br />12,500.00 <br />29 <br />TURF SOD, AND TOPSOIL <br />138 <br />SYS <br />29.75 <br />4,105.50 <br />20 <br />OVERSTORY TREE, 2-1/2" CAL <br />5 <br />EACH <br />750.00 <br />3,750.00 <br />21 <br />TREE WATERING BAG <br />5 <br />EACH <br />30.00 <br />150.00 <br />22 <br />TEMPORARY EROSION CONTROL <br />1 <br />LSUM <br />1,500.00 <br />1,500.00 <br />DIVISION 2 TOTAL <br />162,556.00 <br />Version 09/29/2021 Contractor's Bid for Public Works - 8 <br />