Laserfiche WebLink
$41,400 <br />TOTALS: <br />DESCRIPTION Div. Mgr. (49) <br />Dept. Mgr. <br />(50) <br />Surveyor III <br />(53) <br />Party Chief <br />(127) <br />Inst. Person <br />(248) <br />Designer II <br />(472) <br />Surveyor I <br />(51) <br />Surv. Mapp <br />Assist (94) <br />Clerical <br />(43)Budget <br />- GIS Data Harvest 6.0 $485.58 <br />- Utility Plans, Contact Information and Field Meetings 6.0 $764.34 <br />- Section Corner Information 3.0 $382.17 <br />- Deeds and Property Owner Names & Addresses 10.0 $1,273.90 <br />- Other Recorded Documents 5.0 $636.95 <br />- Send letters to property owners 3.0 $242.79 <br />- Field Reconnaissance $0.00 <br />- Document Review $0.00 <br />$0.00 <br />$0.00 <br />Search / Excavate / Locate <br />- Section Corners (including References)$0.00 <br />- Bench Marks & Survey Control Points $0.00 <br />- Title/Property Evidence 16.0 $2,145.44 <br />Horizontal Control and Field Activity Notes: <br />- GPS Surveying 1.0 10.0 $1,484.57 <br />- On-Site Travers $0.00 <br />Vertical Control and Field Activity Notes: <br />- Off-site 1.0 10.0 $1,484.57 <br />- On-site $0.00 <br />Witnesses: <br />- Control Points 1.0 10.0 $1,255.97 <br />Staking: <br />- Soil Borings $0.00 <br />- Right of Way $0.00 <br />- Boundary $0.00 <br />- Miscellaneous $0.00 <br />$0.00 <br />Topographic Survey: <br />-Mainline(s)110.0 $14,749.90 <br />-S-Line(s)$0.00 <br />-T Line(s)$0.00 <br />- Site Design Topo $0.00 <br />- Detailed Sketches $0.00 <br />- Sanitary and Storm Sewer Investigation $0.00 <br />Other Field Related Work: <br />- Wetland/OHWM Flags $0.00 <br />- Field Check 5.0 $670.45 <br />- Stream Sections $0.00 <br />- Bridge Detail $0.00 <br />Project Administration 5.0 $1,102.20 <br />Project Coordination 5.0 $1,102.20 <br />Lidar/UAS aerotriangulation/Registration/extraction $0.00 <br />Digitzing Planimetrics $0.00 <br />Field Book Preparation 3.0 10.0 $1,704.91 <br />Utility Mapping $0.00 <br />Topography Mapping 42.0 $5,350.38 <br />Boundary/Right of Way Resolution 20.0 $2,873.40 <br />Report Preparation $0.00 <br />Plat Preparation $0.00 <br />Review 5.0 $1,102.20 <br />Revisions 5.0 $718.35 <br />TOTAL - Hours:15.0 0.0 31.0 151.0 0.0 10.0 76.0 9.0 0.0 292.00 <br />SALARY PER HOUR $220.44 $203.84 $143.67 $134.09 $117.40 $111.23 $127.39 $80.93 $62.33 <br />DIRECT SALARY COSTS:$3,306.60 $0.00 $4,453.77 $20,247.59 $0.00 $1,112.30 $9,681.64 $728.37 $0.00 $39,530.27 <br />OTHER SURVEY DIRECT PROJECT COSTS: <br />EXPENSES <br />- VEHICLE -19.0 $65.000 /day $1,235.00 <br />- LODGING -0.0 $100.00 /night $0.00 <br />- MEALS -0.0 $52.00 days x $52/day $0.00 <br />- COPIES (DEEDS, PLATS, RAILROAD PLANS,ETC.) =$600.00 <br />- EQUIPMENT RENTAL -$0.00 <br />- S.U.E. SUBCONSULTANT -$0.00 <br />TOTAL DIRECT COSTS $1,835.00 <br />TOTAL FIELD SURVEY BUDGET $41,365.27 <br />TOTAL FIELD $20,247.59 <br />TOTAL OFFICE $19,282.68 <br />Office Activities <br />TOTAL LABOR BUDGET $39,530.27 <br />TOTAL FIELD SURVEY BUDGET (ROUNDED)$41,400.00 <br />Field Activities: <br />FEE JUSTIFICATION FOR TOPOGRAPHIC SURVEY <br />Kennedy SRTS <br />DLZ Indiana, LLC (2023 INDOT Rates) <br />HOURS BY CLASSIFICATION <br />Research Activities: <br />MH Justification-Kennedy SRTS.xlsx/TOPO [May 30, 2003] 11:32 AM