Laserfiche WebLink
2 <br />East of Notre Dame Avenue, the existing 4-lane roadway will be restriped in each <br />direction to include one (1) travel lane in each direction with turn lanes, buffer area and on-street <br />parking. The existing pavement width will generally remain the same to allow for game-day and <br />event traffic to use the full 2-lane width in each direction. <br />At the intersections of Angela Boulevard/Eddy Street and Angela Boulevard/Joyce <br />Drive/Duey Street, curb bumpouts will be constructed and the westbound right turn lanes will be <br />converted into parallel parking spaces. Additionally, at Eddy Street, the eastbound right turn lane <br />will be converted to a drop off/pickup lane for ride services. <br />A traffic signal will be installed at the intersection of Angela Boulevard and Joyce <br />Drive/Duey Street. <br />III.RESPONSIBILITIES OF CITY <br />a)Contract with a mutually agreed upon engineering firm who shall provide design <br />drawings and project specifications for all work contemplated under this <br />Agreement. <br />b)Provide project management, project oversight, and project inspection for the work <br />performed under this Agreement. <br />c)Bid publicly all work contemplated under this Agreement in accordance with <br />Indiana Code 36, 1-12, et al. and City Ordinance Section 14.5 et al. <br />d)Pay for the project construction work contemplated on Angela Blvd. between SR <br />933 to Notre Dame Avenue. <br />IV.RESPONSIBILITIES OF NOTRE DAME <br />a)Reimburse the City for all design work and project specifications contemplated <br />under this Agreement within sixty (60) days of the request from the City. In <br />addition, Notre Dame agrees that the City shall have a non-exclusive right to use <br />any design drawings and project specifications created in relation to this <br />Agreement. <br />b)Pay for project construction work contemplated on Angela Blvd. between Notre <br />Dame Avenue and Twyckenham Drive. <br />V.ADDITIONAL PROJECT WORK