Laserfiche WebLink
BID TABULATION <br />2023 Contractor Paving Round 1 <br />Project No: 123-021 <br />For Bids Due: April 11, 2023 <br />Base Bid <br />Item No.Description Quantity Unit Unit Price Item Total Unit Price Item Total Unit Price Item Total <br />1 Maintenance of Traffic 1 LS 62,521.85$ 62,521.85$ 80,348.00$ 80,348.00$ 32,880.10$ 32,880.10$ <br />2 Mobilization and Demobilization 1 LS 62,521.85$ 62,521.85$ 52,936.78$ 52,936.78$ 62,000.00$ 62,000.00$ <br />3 Milling Concrete, 2”2,393 SY 4.20$ 10,050.60$ 4.36$ 10,433.48$ 12.00$ 28,716.00$ <br />4 Milling Asphalt, 3"33,181 SY 5.00$ 165,905.00$ 3.70$ 122,769.70$ 4.20$ 139,360.20$ <br />5 HMA Surface, 9.5 mm – Type B, PG 64-28P 2,462 TONS 131.00$ 322,522.00$ 99.87$ 245,879.94$ 110.00$ 270,820.00$ <br />6 HMA Surface, 9.5 mm – Type B, PG 70-22P 649 TONS 131.00$ 85,019.00$ 98.77$ 64,101.73$ 111.00$ 72,039.00$ <br />7 HMA Intermediate, 12.5mm - Type B 2,737 TONS 117.00$ 320,229.00$ 80.94$ 221,532.78$ 94.00$ 257,278.00$ <br />8 Tack Coat 8.65 TONS 0.84$ 7.27$ 1.00$ 8.65$ 650.00$ 5,622.50$ <br />9 Joint Adhesive, Surface 12,729 LF 1.00$ 12,729.00$ 0.66$ 8,401.14$ 1.80$ 22,912.20$ <br />10 Adjust Manhole to Grade 33 EA 525.00$ 17,325.00$ 250.00$ 8,250.00$ 1,400.00$ 46,200.00$ <br />11 Adjust Inlet to Grade 26 EA 530.00$ 13,780.00$ 250.00$ 6,500.00$ 450.00$ 11,700.00$ <br />12 Adjust Water Valve Structure to Grade 7 EA 580.00$ 4,060.00$ 100.00$ 700.00$ 84.00$ 588.00$ <br />13 Pavement Message Markings, Thermoplastic, White, Lane Indication Arrow 2 EA 420.00$ 840.00$ 165.00$ 330.00$ 250.00$ 500.00$ <br />14 Line, Thermoplastic, Solid, White, 4"66 LF 0.90$ 59.40$ 0.86$ 56.76$ 5.00$ 330.00$ <br />15 Line, Thermoplastic, Solid, White, 6"603 LF 0.71$ 428.13$ 1.35$ 814.05$ 10.00$ 6,030.00$ <br />16 Line, Thermoplastic, Solid, Yellow, 4"2730 LF 0.74$ 2,020.20$ 0.86$ 2,347.80$ 2.00$ 5,460.00$ <br />17 Grooving for Pavement Markings, 4"2796 LF 0.71$ 1,985.16$ 0.74$ 2,069.04$ 1.50$ 4,194.00$ <br />18 Transverse Marking, Thermoplastic, Solid, White, 24"74 LF 9.22$ 682.28$ 14.85$ 1,098.90$ 35.00$ 2,590.00$ <br />19 Concrete Curb Ramp, Removal 910 SY 210.00$ 191,100.00$ 47.76$ 43,461.60$ 42.00$ 38,220.00$ <br />20 Concrete Curb Ramp, Installation 910 SY 31.50$ 28,665.00$ 151.16$ 137,555.60$ 207.00$ 188,370.00$ <br />21 Traffic Loop Lane Replacement 2 LF 1,265.00$ 2,530.00$ 3,200.00$ 6,400.00$ 3,200.00$ 6,400.00$ <br />22 HMA for Patching 235 TONS 300.00$ 70,500.00$ 190.23$ 44,704.05$ 154.00$ 36,190.00$ <br />1,375,480.74$ 1,060,700.00$ 1,238,400.00$ <br />I hereby certify that the above truly and accurately represents bids received for this project on April 11, 2023 <br />Scott Kreeger, Project Engineer <br />Y <br />Y <br />Rieth Riley Construction Co., Inc.Milestone Contractors North, Inc. <br />Y Y <br />Y <br />YY <br />M/WBE Inclusion <br />Addendum #1 <br />Y <br />Y <br />Bid Bond Y <br />Addendum #2 <br />BASE BID TOTAL <br />Engineer's Estimate <br />Non-Collusion Affadavit <br />Page 1 of 1