My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Waste Treatment Chemical Wastewater 2023-2024 - USALCO
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Bids
>
Opening of Bids - Waste Treatment Chemical Wastewater 2023-2024 - USALCO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2023 4:18:04 PM
Creation date
4/25/2023 4:17:58 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
4/25/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />a) Ton container valves contain no fusible plugs. The container itself is equipped <br />with six threaded fusible plugs, three in each head, spaced approximately 1200 <br />apart. <br />2. Ton Container Inspection, Cleaning, and Reconditioning <br />a) In addition to the required period retest, it is recommended that each ton <br />container be internally and externally inspected prior to each filling. This <br />includes all appurtenances, such as valves and fusible plugs. Criteria for such <br />inspection is outlined in "Cylinder and Ton container Procedure for Chlorine <br />Packaging," Chlorine Institute Pamphlet 17, Sections 3, 4, and 5. <br /> <br />F. PERIODIC RETESTING AND RE-INSPECTION <br />1. Ton Containers to be Tested <br />a) Ton containers must be retested at least once in five years (DOT Section 173.34e <br />and Section 173.31d). <br />b) Ton containers can be filled until the end of the calendar year during which their <br />five-year test is due. <br />c) Retests are also required after any reheat treatment. In addition, retest any <br />container which shows evidence of weakness at any time, or show a 5 percent or <br />more loss in weight. <br />2. Test Procedure <br />a) Ton containers are hydrostatically retested by the hydrostatic expansion method <br />[DOT Section 173.34 (a) and Section 173.31 (d)]. If at the time of <br />requalification a container shows a leak or a permanent expansion which <br />exceeds 10% of the total expansion, it must be condemned. <br />3. Container Records <br />a) Records must be kept showing results of the test. Each container must have the <br />test date plainly and permanently stamped into the metal of one head or the <br />chime of each task passing the hydrostatic retest. <br /> <br />G. CONDITIONS OF DELIVERY <br />1. Delivery Location: <br /> <br />Location Type of Container Address <br />Wastewater 2,000 lb. Ton Container 3113 Riverside Drive <br /> <br />2. Vendor personnel shall conduct all activities related to the loading and <br />unloading of ton containers. <br />3. Minimum deliveries are one (8) ton containers. <br />4. Supplier must be able to guarantee delivery within 3 to 4 calendar days <br />after order placement. Failure to meet delivery times shall result in <br />vendor being disqualified and award nullified.
The URL can be used to link to this page
Your browser does not support the video tag.