PART 2 — SPECIAL PROVISIONS <br />2.01 SPECIAL PROVISION, XII "PROSECTUTION AND PROGRESS", Item B, No. 1 <br />1. REVISE to read "The project will have a substantial completion date of Friday, November <br />3, 2023 opening of the roadway to full traffic, including all pavement markings. With a final <br />completion date of Friday, December 1, 2023 for walkways, lighting, and improvements <br />behind the curb. All Landscape improvements shall be installed during the dates identified <br />in the landscape specifications, but must be completed no later than April 26, 2024. The <br />contract time will start when the Notice to Proceed is delivered and signed. <br />2.02 SPECIAL PROVISION, LXIII "STORM SEWER PIPE", Item B, No. 18 <br />1. ADD pay items: <br />WATER MAIN GRADE PIPE FOR STORM SEWER, 12 IN ............... LFT <br />WATER MAIN GRADE PIPE FOR STORM SEWER, 15 IN ............... LFT <br />2.03 SPECIAL PROVISION, BID PROPOSAL <br />1. REPLACE All previous Bid Tabs pages with attached BID TAB document. Line items, item <br />descriptions and quantities have been revised. <br />PART 3 — CONSTRUCTION DOCUMENTS <br />3.01 SHEET 17, DEMOLITION PLAN <br />I. REPLACE this plan sheet with attached Sheet 17 document. Revisions include correction <br />of storm structure call out to be removed. <br />3.02 SHEETS 22, 23, and 24 of the PLAN AND PROFILE PLAN <br />1. REPLACE these plan sheets with attached Sheets 22, 23, and 24. Revisions include removal <br />of underdrain information and addition of structure notations. <br />3.03 SHEETS 31 AND 32, STRUCTURE DATA TABLE <br />1. REPLACE these plan sheets with attached Sheet 31 and 32. Revisions include correction of <br />storm structure types and quantities. <br />