My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - New Fellows Booster Pumping Station – Donohue & Associates, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to PSA - New Fellows Booster Pumping Station – Donohue & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2023 3:08:58 PM
Creation date
4/11/2023 3:08:55 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 2 <br />(Exhibit K – (Amendment to Owner-Engineer Agreement) – Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />c)Chapter 3 – Future Needs <br />d)Chapter 4 – Evaluation of Alternatives <br />e)Chapter 5 – Evaluation of Environmental Impacts <br />f)Chapter 6 – Proposed Project <br />g)Chapter 7 – Legal, Financial and Managerial Capabilities <br />h)Chapter 8 – Public Participation <br />i)Prepare an Executive Summary of the PER. <br />j)Prepare appendices to the PER, including: <br />i) Signatory Authorization Resolution <br />ii) PER Acceptance Resolution <br />iii) Financial Information Form <br />iv) Public Notice <br />v) Preliminary Design Summary <br />vi) Indiana SRF Green Project Reserve Sustainability Incentive Checklist <br />vii) Asset Management Certification Form <br />5)Other services associated with the PER will include the following activities: <br />a)Attend a preplanning meeting with Indiana SRF and Owner representatives to <br />prepare a PER. Attend any other coordination meetings with Indiana SRF as <br />required for approval of PER. <br />b)Conduct a workshop with the Owner to review drafted chapters 1-6. <br />c)Assist the Owner with scheduling, advertising for and conducting a public <br />hearing for the prepared PER. The Owner shall pay the cost for publishing the <br />public hearing notice in a local newspaper and prepare the minutes or transcript <br />for the public hearing. <br />d)Prepare a transmittal letter for signature by the Owner to submit the prepared <br />PER to Indiana SRF. Submit the signed transmittal and PER copies to Indiana <br />SRF for review and respond to review comments. Four (4) copies of the <br />completed PER will be printed for distribution of two (2) copies to the Owner <br />and two (2) copies to Indiana SRF. An electronic PDF copy of the completed <br />PER will also be submitted to the Owner and Indiana SRF if requested. <br />e)Respond to review comments from Indiana SRF for the submitted PER and <br />revise the PER based for revisions requested by Indiana SRF. <br />6)Scope of additional services does not include ancillary consultation services, <br />including: <br />a)Financial and/or legal services. <br />b)Property acquisition service. <br />c)Additional design, bidding or construction phase services. <br />d)Development and/or review of Asset Management Program(s). <br />b.The schedule for rendering services associated with this Amendment No. 1 are as <br />follows: <br />1)Locust Booster Station Improvements:
The URL can be used to link to this page
Your browser does not support the video tag.