Laserfiche WebLink
Page 8 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />B. The Post-Construction Phase services may commence during the Construction Phase and, if not <br />otherwise modified in this Exhibit A, will terminate twelve months after the commencement of the <br />Construction Contract’s correction period. <br />A1.07 Exclusions <br />A. This Contract does not include fees or provisions for Right-of-Way acquisition, wetland delineation <br />or geotechnical boring or geotechnical engineering services. Such services would require an <br />amendment to the Contract if needed. <br />