My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 1 to PSA - Rescope Sm. Park 35th. St. Retention Basin – McCormick Engineering, LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 1 to PSA - Rescope Sm. Park 35th. St. Retention Basin – McCormick Engineering, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2023 3:08:55 PM
Creation date
4/11/2023 3:08:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
4/11/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 5 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />Contractor’s failure to furnish or perform the Work in accordance with the Contract <br />Documents. <br />8. Defective Work: Reject Work if, on the basis of Engineer’s observations, Engineer believes <br />that such Work (a) is defective under the standards set forth in the Contract Documents, (b) <br />will not produce a completed Project that conforms to the Contract Documents, or (c) will <br />imperil the integrity of the design concept of the completed Project as a functioning whole <br />as indicated by the Contract Documents. <br />9. Clarifications and Interpretations; Field Orders: Issue necessary clarifications and <br />interpretations of the Contract Documents as appropriate to the orderly completion of <br />Contractor’s work. Such clarifications and interpretations will be consistent with the intent <br />of and reasonably inferable from the Contract Documents. Subject to any limitations in the <br />Contract Documents, Engineer may issue field orders authorizing minor variations in the <br />Work from the requirements of the Contract Documents. <br />10. Change Orders and Work Change Directives: Recommend change orders and work change <br />directives to Owner, as appropriate, and prepare change orders and work change directives <br />as required. <br />11. Shop Drawings and Samples: Review and approve or take other appropriate action in respect <br />to Shop Drawings and Samples and other data which Contractor is required to submit, but <br />only for conformance with the information given in the Contract Documents and <br />compatibility with the design concept of the completed Project as a functioning whole as <br />indicated by the Contract Documents. Such reviews and approvals or other action will not <br />extend to means, methods, techniques, sequences, or procedures of construction or to safety <br />precautions and programs incident thereto. Engineer shall meet any Contractor’s submittal <br />schedule that Engineer has accepted. <br />12. Substitutes and “or-equal”: Evaluate and determine the acceptability of substitute or “or- <br />equal” materials and equipment proposed by Contractor, but subject to the provisions of <br />Paragraph A2.02.A.2 of this Exhibit A. <br />13. Inspections and Tests: Require such special inspections or tests of Contractor’s work as <br />deemed reasonably necessary, and receive and review all certificates of inspections, tests, <br />and approvals required by Laws and Regulations or the Contract Documents. Engineer’s <br />review of such certificates will be for the purpose of determining that the results certified <br />indicate compliance with the Contract Documents and will not constitute an independent <br />evaluation that the content or procedures of such inspections, tests, or approvals comply with <br />the requirements of the Contract Documents. Engineer shall be entitled to rely on the results <br />of such tests. <br />14. Disagreements between Owner and Contractor: Render formal written decisions on all duly <br />submitted issues relating to the acceptability of Contractor’s work or the interpretation of <br />the requirements of the Contract Documents pertaining to the execution, performance, or <br />progress of Contractor’s Work; review each duly submitted Claim by Owner or Contractor, <br />and in writing either deny such Claim in whole or in part, approve such Claim, or decline to <br />resolve such Claim if Engineer in its discretion concludes that to do so would be
The URL can be used to link to this page
Your browser does not support the video tag.